Laserfiche WebLink
<br />Mr. Paul L. McDill, President <br />Riverside Reservoir and Land Co. <br />March 24, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCB Desiqn and Construction Administration Procedures. <br />Tim Feehan will contact you regarding the CWCB requirements concerning design <br />and bidding of the construction project. Tim will make construction inspections, which <br />will be the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCB Guidelines for Financial Assistance. A copy of our <br />Guidelines has been provided to your engineer previously. <br /> <br />On behalf of the Board, I would like to thank you for applying for a water project loan from <br />the Colorado Water Conservation Board. <br /> <br />S~LJJ- <br /> <br />Mike Serlet, P.E.. Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachment: <br /> <br />Updated Memo: RiversideDiversion300memo <br /> <br />cc (w/Attachment): Mr. Eric Wilkinson, Board Member, Colorado Water Conservation Board <br />Jack Odor, P,E., GASP, 219 E. Railroad Ave., Fort Morgan, CO 80701 <br />CWCB Section B Staff <br />Linda Bassi,.AGO <br />Chrono File <br /> <br />C: wp51 \Proj-New\RiversideDiversion300Ltr <br />