My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01460
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01460
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2012 9:50:06 AM
Creation date
11/15/2006 2:12:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150006
Contractor Name
Palisade, Town of
Contract Type
Loan
Water District
72
County
Mesa
Bill Number
HB 95-1155
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />. <br /> <br />. <br /> <br />Mr. Larry W. Cleaver, Town Administrator <br />Town of Palisade <br />December 20, 1994 <br /> <br />2 <br /> <br />2156), or with the Authority itself, that the Town of Palisade is on the DLG needs list. <br />This will keep the door open for a loan from the Revolving Fund, at an interest rate of <br />4.5%. If you receive a loan from the Revolving Fund for a portion of your project, we <br />can stilI loan you the rest at a 4.0% rate, up to a maximum of $750,000 (but not more <br />than 75% of the total project costs). <br /> <br />c. An aooroved contract must be in olace before the construction work can oroceed. Jan <br />IIIian of this office will draft the contraCt in March or April of 1995, and will send you <br />a review copy upon request. Final contrac.t documents will be sent to you for signing <br />after the Construction Fund bilI is signed by the Governor, about June 1, 1995. Please <br />contact Jan (303-866-3441) after February 1, 1995 to initiate the contracting procedure. <br /> <br />On behalf of the Board, 1 would like to thank you for applying for a Construction Fund loan <br />from the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />MUi1MuP ~ <br /> <br />WiIliam P. Stanton P.E. <br />Chief, Planning and Construction Section <br />Colorado Water Conservation Board <br /> <br />NS:jvs <br /> <br />Atta.chmenu: Updated Memo 29M.NOY and Feasibility Study Checklist <br /> <br />cc (wI Attachments): <br />Eric Kuhn, Member eWeB <br />Steve LaBonde, Westwater Engineering <br /> <br />cc (w/o Attachments): <br />Chuck Lile, eWeB Director <br />Peter Evans, eWeB Deputy Director <br />Dan Law, Colorado Water and Power Development Authority <br />Barry Cress, Colorado Division of Local Government <br />Bill Green. eWeB Staff <br />John Van Seiver, CWCB Staff <br />Mike Serlet, ewes Staff <br />Ian, Illian, CWCB Staff <br /> <br />W:\WCfRANSISEC jl129MNOV,L 1R <br />
The URL can be used to link to this page
Your browser does not support the video tag.