Laserfiche WebLink
<br />"'II <br />'~' <br />"'.' <br />',,<.: <br /> <br />~;.;;~....., <br />~i" <br />'.gJ <br /> <br />As a result of that report, the Department of the Interior <br />ordered a second phase of the study to continue. The decisions <br />concerning operational changes at the dam and the preparation <br />of an EIS were to have been made following those additional <br />studies. <br /> <br />The EIS will be prepared by Reclamation's Upper Colorado <br />Regional office which has operational responsibility for Glen <br />Canyon Dam. Specific actions, public involvement schedules, <br />and other detailed information will be released as it is <br />developed. <br /> <br />... <br /> <br />2 <br />