Laserfiche WebLink
<br />( <br /> <br />Table C-6.--Comparison of Land Acquisition Requirements <br /> for the Narrows Unit <br /> (l970 through 1983) <br /> (acres) <br /> Addendum No. 2 Addendum to DPR Authorized <br />Use to DPR DPR 1976 1973 August 28, 1970 <br />Dam, reservoir, <br />and relocations 24,363 34,445 29,916 29,916 <br />Fee (24,363) (34,445) (27,786) (27,786) <br />Easement 0 0 ( 2,130) ( 2,130) <br />Recreation 1,340Y 970Y 2,8l0 2,810 <br />Fish and wildlife 6,75sY 7,170Y 3,520 3,520 <br />Tot all and purch ased 32,461.Y 42,585 36,246 36 ,246 <br />Wi thdrawn from <br />public domain 1,20711 2,315 2,315 2,315 <br /> <br />Y Lands to be acquired specifically for the purposes cited. In addition, <br />right-of-way acquired for the dam and reservoir which is not retained by <br />the Bureau for operations purposes will be administered by the State of <br />Colorado for recreation and fish and wildlife purposes under terms of an <br />overall management and development plan. <br /> <br />E.; The major change in the reductlon of land needed is without acquiring <br />Jackson Lake. <br /> <br />11 Includes 603 acres which have been acquired by the 8ureau of Reclamation, <br />but does not include 328 acres which have been withdrawn and are outside the <br />present acquisition boundary. <br /> <br />\ <br /> <br />59 <br /> <br />,",-, <br />