Laserfiche WebLink
<br />. <br /> <br />Woodward-Clyde Consultants <br /> <br />.~ " ") n <br />t..VI_ <br /> <br />, <br /> <br />I. INTRODUCTION <br /> <br />1. General <br /> <br />. <br /> <br />Under a contract dated October 1, 1977 with the State of <br /> <br /> <br />Colorado, Department of Natural Resourc~olorado Water <br /> <br /> <br />Conservation Board, Woodward-Clyde co~~~ts agreed to <br /> <br /> <br />assemble a panel of engineers, geOl~~~~Ydr010gists to <br /> <br /> <br />make a review of the foundation g9,~logy and fdtl~ion seepage <br /> <br /> <br />conditions and to evaluate th~dGosed maximum dam section for <br /> <br /> <br />the proposed Narrows Reservo~ ~h~ South Platte River in <br /> <br /> <br />Colorado. The review was made~~le the panel to formulate <br /> <br /> <br />opinions, conclusions, and recommenda~ns regarding the safety <br /> <br /> <br />of the foundation and p~~a~t~ll structure. <br /> <br /> <br />The woodward-Clyde ~n~~6ts-6anel consisted of the <br /> <br /> <br />following person~ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />(2) Wi~~A~~Venger, Chairman of the Board <br />~~'n~.~ngineer) <br /> <br /> <br />&3} ugen~~~4'oner, former Principal and presently a <br />Staff Of sultant (Engineering Geologist) <br /> <br />4 :o.......W~~~~~,b. Holtz, Staff consultant (Geotechnical <br /> <br />~V,r <br /> <br />(5) Dr~A~ hony Wolfskill, Vice President, Southern <br />Reglbn (Geotechnical Engineer with special expertise <br />in slurry cutoff trenches) <br /> <br />and <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br /> <br />t <br /> <br />- 1 - <br /> <br />. <br /> <br />IIIDt. <br />.. <br />