My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12402
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:55 PM
Creation date
10/12/2006 5:34:58 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443
Description
Narrows Project
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1978
Author
Woodward-Clyde Consu
Title
Review Of Data And Studies Developed By The Bureau Of Reclamation For The Feasibility Stage Design Of Narrows Dam Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Woodward-Clyde Consultants <br /> <br />c~....,r, <br />.t.u I:." <br /> <br />site. A listing of the material received is included in the <br /> <br />references, Appendix A. <br /> <br />~, <br /> <br />On November 22, 1977 the wee panel members met Messrs. <br /> <br /> <br />Griffin and Bennett at the Ft. Morgan project office and toured <br /> <br /> <br />the dam site and borrow area sites with ~ and other members <br /> <br />2. Scope of Work <br /> <br /> <br />of the project office. <br /> <br />The principal objectives of ~ is 0 provide <br />geotechnical engineering servic~ for the purpose of <br />of the proposed <br />dam and foundation uti1iZing~ ta ailable from the Bureau of <br />Reclamation's feasibility stage des' n studies which were <br />supplied to us, an on-~~'t~~eex~ and geologic recon- <br />naissance, and independe ,'~~~~d analyses. Narrative <br />discussions conc~Q~ the e~anells field observations, <br />d,oig" d'C': d;>,n~'~di'" ood ,"",y",,_. 'hi'~ l,d .co.. .. <br />our concluslo ~~ic m .tlons-ar-e-l-flci-uded-rn-this-' <br /> <br />. . . ;;;,~':: ~ - . ,,", ~o" ~ h' "f .cy of Ch. d,. ,"d f oo"d, " 0" <br /> <br />t~} <br /> <br />foun ~i~~ Our aluations did not include, nor were we asked <br /> <br /> <br />to incl;:;ae,~ r important overall considerations including <br /> <br /> <br />hydrology, flcro contr<;>l criteria, downstream flood flow, <br /> <br />were <br /> <br /> <br /> <br />geotechnical assessment of the dam and its <br /> <br />- 3 - <br /> <br />., <br />
The URL can be used to link to this page
Your browser does not support the video tag.