Laserfiche WebLink
<br />I aUlc II <br /> <br />. <br /> <br />1985 Runoff by Sub-basin <br /> <br /> Total Tots I Total Tota J 1985 <br /> SF MF Comm. LL &, OS Tota I <br />Subbasin Runoff Runoff Runoff Runofr RUnoff <br />Direct Flow #3 10.9 0.0 28.1 11 , 3 50.3 <br />T raub I e some Cr. 37.4 1.8 132.4 4.2 175.7 <br />Direct floW' #4 27.1 4.3 117.1 4.4 153.0 <br />Turkey Creek 23,5 0.0 230.7 9.5 263,7 <br />Cub Creek 130.4 0.0 194.4 16.2 343,0 <br />N. Turkey Cr. 22.5 0.0 60.6 16.7 122.1 <br />S. Turkey Cr. 13.9 0,0 165.2 9.6 188.8 <br />Direct Flow 1/1 1,6 2.9 480.1 6,5 491.1 <br />Direct Flow 1/2 6.9 0,0 21.1 5,3 JJ.3 <br />Mount Vernon Canyon 0.0 14.3 345,5 4.1 363.9 <br />Rooney Gulch 23.8 0.0 297.8 5.9 327.6 <br />Tota I 297.9 23.2 2093.3 96.0 2512.5 <br /> Table 12 <br /> 1990 Runoff by Sub-basln <br /> <br /> Tota I Total Tota r Tota I 1990 <br /> SF MF Comm. LL &, OS Total <br /> Subbasin Runorr Runoff Runoff Runoff Runoff <br /> D I rec t Flow /13 11.2 0.0 35.6 11 .3 58.1 <br /> Troublesome Cr. 36.6 2.2 136.6 4.2 181.6 <br /> Direct Flow 1/4 27.7 4.4 136.6 4.4 173,0 <br /> Turkey Creek 24.4 0.0 236.8 9.5 270.8 <br /> Cub Creek 132.9 0.2 199.4 16.1 350.6 <br /> N. Turkey Cr. 25.8 0.6 83.9 16.7 128.9 <br /> S. Turkey Cr. 17.1 0.6 166.4 9.7 195.8 <br /> 01 rec t Flow 1/1 3.0 2.9 461. 4 6.5 493.8 <br /> Direct Flow /12 10.1 0.0 21.8 5.3 37.2 <br /> Hount Vernon Canyon 0.6 15.8 353.3 4.1 373,8 <br /> Rooney Gulch 33.2 0.0 459.9 5.7 498.7 <br />-J <br />0 Tota' 324.6 26.7 2313.6 97.4 2762.2 <br />