<br />, <br />\, . <br />r i.;:' ~I <br /> <br />I <br />I <br /> <br />PUMP1Nr: <br /> <br />"' <br /> <br />house, transformer rack, and switch rack had been completed by <br />the contractor to an extent sufficient to permit District forces to <br />proceed with the installation of equipment in these structures. <br />Erection of the pumps and motors was commenced immediately <br />following completion of the general contract and continued through- <br />out the winter of 1938-39. The last concrete work, that for the <br />motor foundation, was placed November 22, 1938. Erection of the <br />motors was completed in March 1939, and in July 19:39 equipment <br />installation was completed and the pumps were ready for operation. <br /> <br />Camps and Housing <br />Concurrently with the installation of equipment, District forces <br />were engaged in improvement of the grounds around the pumping <br />plants and the rearrangement of the construction camps to provide <br />living quarters for the permanent operating personnel. Yards and <br />roads immediately adjacent to the plants and roads in the camp <br />areas were graded and surfaced with an oil mix paving. Five addi- <br />tional four-room dwellings of a permanent nature, stucco with tile <br />roof, were constructed under contract at Iron Mountain, one at <br />Eagle Mountain, and two at Hayfield. One new residence was built <br />by District forces at Gene camp. Frame dwellings used at the <br />various substations on the construction power system were moved <br />to the Gene, Iron Mountain, and Hayfield camps and remodeled. <br />Air conditioning equipment was added, and they are now used as <br />operators' cottages. The guest house and the office of Division :3 <br />camp at Eagle Mountain were remodeled into two family dwellings. <br /> <br />Prelimhwry Opemtion <br />On adobeI' 16,}~3_8_t~e_~r)il!\yay_g!lte~_at Parker dam werelow-- - - - --- <br />"- - ,'- -el'ecfaiid' excess "'ate!' was released from storage at Boulder to begin <br />filling Lake Havasu, the reservoir created by Parker dam. By <br />January 1, 1939 the reservoir had filled to a depth sufficient to <br />permit pumping at the Intake plant. On January 7th, in the pres- <br />ence of the board of directors, members of the District staff, and <br />invited guests, including representatives of the cities in the District, <br />the Intnke plant was formally placed in operation. The ceremonies <br />were held at the west portal of the Colorado River tunnel. After <br />addresses by Chairman Whitsett, Director Emrne, and General <br />Manager Weymouth, the general manager directed Chief Electrical <br />Engineer J, M. Gaylord to start the pumps. The entire ceremony, <br />including an address by Senator Hiram .Johnson from Washington, <br />D. C., the starting of the pumps and the arrival of the first water <br /> <br />I <br />.' <br />I <br />