My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12366
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12366
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:46 PM
Creation date
10/12/2006 5:34:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
1/1/1940
Author
Metro Water District
Title
Metropolitan Water District of Southern California - Second Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,- <br />J.... .," ;:; <br /> <br />PARKER DAM <br /> <br />41 <br /> <br /> <br />." <br />{~~, <br /> <br />f;- <br /> <br />.. <br /> <br />P"rkcr dom <br /> <br />\. <br /> <br />electric power. The contract of February 10, 1933, between the <br />United States and the District for the cooperative construction of <br />Parker dam gave the United Stat.es one-half of the power privilege <br />, _ ,at_this site,. the other Jjalf .being, retaine(LbL the District.. The. <br />development of the site earlier than originally planned was under. <br />taken by the U. S. Bureau of Reclamation under a supplemental <br />contract dated April 7, 1939, in order to relieve a severe shortage <br />of power in Phoenix. Arizona, and to furnish power for pumping <br />on the Gila irrigation project in southwestern Arizona. The first <br />installation is to consist of three 25,000-kw generating units, one <br />to supply the Gila load, and two for the PhoJ'nix power customers- <br />the Salt River Valley Water Users' Association and the Central <br />Arizona Light and Power Company. Funds for the construction <br />of the plant are being advanced by the United States. One of the <br />three units is to be installed in the District's half of the power plant, <br />but for at least ten years after being placed in operation this unit <br />is to be used on the Phoenix load. During this period one-half the <br /> <br />I. <br /> <br />I <br />, <br />~ <br />I <br />I, <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.