Laserfiche WebLink
<br /> <br />~r; ":, <br />.L I ",; ~ <br /> <br />I' <br /> <br />"~:TUOI'OI.IT\' \\\TEH IlI~THICr <br /> <br />('Olllpleted prior to disbanding the construction utilities opemtioll <br />mill m:tintl'lUlIll'e f(JI.ces in Fl'bru3'.y 1!J.1O. <br />The net cost of the cunstruction telephone system to ,June ;Jl), <br />HJ 10 is shown ill table i. Till' maill lines ana equipment of this <br />systl!nJ 11.I\'e now hecome R part of the permanent conununkations <br />system of the Ill"Ojl'Ct, which includes also the telephone line from <br />Iron )!ount:tin to Camino switchin~ stt\tioll and Boulder dam. In <br />addition 10 the net eosl of $ln.167.!)f) shown for lhe construction <br />system, lhe!'e has lX'l'll expendt'<1, as of June ;;0, IjllO, on the Boulder <br />line a total uf ::;115.lii:!.-15, nmking a gTllIld totill cost to <iak for. <br />the clltil.e tel~'pllOne system of $:!88,8lO.lJ. <br /> <br />COllxtrudiol! I:oad SU.~ft 111 <br />In Februa,.y 19:18 the pdllcipal Distdct 1"011<Is along the north <br />sidt-, of thp Co,ldwlJa \":tlley. hl~t\n>(>n I :al"llet and Inaio. were truns. <br />ferred to lb\'erside County. <br />The lntllRf"'r of the trunk l"Oad f!"Om DeRel-t Cl'lltt'l" in Hiverside <br />County to Earp in ~1l11 Gernardino Coullty was author.ized by two <br />resolutiollS of the Distl"il't board of directors :lIld tht' portion in each <br />{'ounty was :w('eptl:'f! b.... thl.' reSIJt."(:ti\"(' boards of supervisors on <br />the same dllle. Del:emher 12. l!l:18. <br /> <br />. <br /> <br /> <br />lIallliny JIIUl'ij (fJllipm("tlt <br /> <br />