Laserfiche WebLink
<br />" <br /> <br />11 <br /> <br />. <br /> <br />mouth of the Grand have been estir.ated at about .:600,000, of which <br />,;82,000 are in the backwater area of the llississippioo <br /> <br />3. The plan ef imprOV8Q8nt reeo~nded by the De~rtrnent to Con- <br />grass in January 1939, and published as H. D. No. 107176/1, \YaS for the <br />oonstruction of 3 reservoIrs for the production of hydroelectric power <br />and for flood control.. These 3 reservoirs are the Pensacola, l.:a.rkr.9.In <br />Ferry and Fort Gibson reservoirs, located at mile 77,46 and 8 respect- <br />ively, above the riv"3r's mouth. The proposed pl'ln l'1B.S as follo~7s: <br /> <br />, <br /> <br />Reservoir <br /> <br />Po....r <br />Storage <br /> <br />Flood <br />Control <br />Stora.~e <br /> <br />Total <br />Storlle;e <br /> <br />Installed <br />Capaci t"J <br /> <br />Firm <br />Capacity <br /> <br />Annua 1 <br />::nergy <br />Output <br /> <br />Pensacola 1,140,000 960,000 <br />Markham Ferry 213,000 239,000 <br />Fort Gibson 365;~ 486,000 <br />Total l,718,aXn.6S5,OOO <br /> <br />2,100,000 <br />452,000 <br />851,069 <br />} ,403 ,000 <br /> <br />6}.000 <br />1jO ,000 <br />1.0 ,000 <br />143.000 <br /> <br />58,000 265,000,000 <br />40,000 160,000,000 <br />40,000 170,000,000 <br />138,000 595.000,000 <br /> <br />The costs ~rere estimated as follo'.7s: <br /> <br />. <br /> <br />Reservoir Flood Control Power Total <br />Pensacola 9,600,000 13,,800,000 23 "f::I:Jo,OOO <br />l!arkhe.m Ferry 2,500,000 11,800,000 11., }OO. 000 <br />Fort Gi bean 5,000,000 6,700,,000 13,,700 ,000 <br />Total 17,300,,000 }4.}OO,OOO 51.600 .000 <br /> <br />The cost of flood oontrol storage is, therefore, estimated at about JIO <br />per aCr'e-foot. <br /> <br />4. The average annual benefits for' the system were estirnated as <br />fo 110t"13 : <br /> <br />Flood Control . 91,},ooO <br />. . . . . . . . . . . ..; <br />POToe r . . . . . . . . . . 2,466,000 <br />Recreation~ . . . . . . . . . . . . 49,000 <br />Total ;;3,458,000 <br /> <br />The annual charges \~re esti~ted at /2,334.000. <br /> <br />, <br /> <br />5. The Pensacola P.eservoir is now completed. It was constructed <br />by the Grand River Dam ~.utoority cree..ted by the State of OklaooM. and <br />is under the provisions of the Federal Po~~r License. This license <br />provides, among other thing~ that the uppar ten feet of the reservoir <br />shall be reserved for the control of floods, but the authority shall not <br />be required to iI:J.pound water above an elevation five feet below crest <br />until the united States has acquired the necessary flowage rir~ts above <br />that elevation. In other vrords, the present effective flood control <br />storage, instead of beint 960,000 acre-feet as recomnended in the re- <br />porl of the Department, is only 245,000, and My be incroased to I): <br />total of 540,000 ~~en the United States acquires the lands, easements <br />and rights-of-../8.Y in the top five feet. <br /> <br />. <br /> <br />240J <br />