My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12318
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:35 PM
Creation date
10/12/2006 5:31:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100
Description
CRSP
Basin
Colorado Mainstem
Date
9/1/1980
Author
USDOI/BOR
Title
Review of Colorado River Storage Project and Related Individiual Participating Projexts, Water and Power Resources Service
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />that repayment of amounts in excess of the $156.8 million will be covered by <br /> <br />amendments to the existing contract, or with third party agreements scheduled for <br /> <br />implementation before commitments are made which would exceed existing <br /> <br />contract repayment obligations. <br /> <br />In view of the existing explicit contractual repayment terms, drawn-out legal <br /> <br />proceedings and other problems could be encountered in attempting to renegotiate <br />adequate repayment contracts. That is, CUWCD may be reluctant to contractually <br /> <br />assume the increased project costs especially when one considers existing contract <br /> <br />terms, the magnitude of the cost increases, and their effect on water rates. <br /> <br />Regional officials advised us that: <br /> <br />"The Central Utah Water Conservancy District passed a resolution on <br />November l~, 1979, to pursue with diligence, a course of action to <br />correct the problem of the Bonneville Unit construction costs out- <br />stripping the district's contractual obligation. This action is to be <br />concluded by September 1980. As part of the action, the district has <br />tentatively set August 19, 1980, as the date for an election on the <br />amended or new repayment contract if that course of action becomes <br />necessary. The district is now studying the various alternatives and <br />options available." <br /> <br />The Assistant Secretary, Land and Water Resources, advised us that "...some form <br /> <br />of repayment contract will be executed prior to the further commitment. of <br /> <br />construction funds when the contract ceiling has been reached." <br /> <br />Recommendation <br /> <br />In view of, (1) the magnitude of the increase required in the District's contractual <br /> <br />repayment obligation, (2) the potential for problems associated with the District <br />obtaining local approval of an amended or new contract, and (3) the relatively short <br /> <br />14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.