My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12307
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12307
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:14:33 PM
Creation date
10/12/2006 5:30:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106.L
Description
Animas La Plata Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/2002
Author
DOI-BOR
Title
Animas La Plata Project - Chronology of Events - As of October 2002 - From BOR Website - 11-01-02
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.- <br /> <br />.. <br /> <br />002336 <br /> <br />. <br /> <br />annual depletion of 57,100 acre-feet. The amendments <br />also establish a Colorado Ute Settlement Fund for <br />generating appropriations for the construction of the project <br />features within a 7-year period. Additionally, the <br />Amendments established a $40 million Resource Fund for <br />the Ute Mountain Ute and Southern Ute Indian Tribes for <br />municipal and rural water development, as well as resource <br />acquisition and enhancement; <br /> <br />. 200 I - Approval was granted by the Reclamation's <br />Commissioner John W. Keys to initiate construction on <br />the Animas-La Plata Project and establishes November 9, <br />2001 as the date offonnal initiation of construction. Also, <br />in 200 I the final design for the dam and pumping plant <br />began. <br /> <br />. <br /> <br />. 2002 - There were four major tasks initiated this <br />year. First, field work began on the cultural resource <br />mitigation program within the project area. Second, <br />construction began on the inlet conduit pipeline sleeve at <br />the site where a natural gasline crosses the path of the <br />inlet conduit. The inlet conduit will carry project water <br />from the Animas River to Ridges Basin Reservoir. The <br />inlet conduit sleeve was completed in October of 2002. <br />Third, Weemuniche Construction Authority began <br />constructing haul roads to facilitate traffic during the <br />construction of the dam and outlet works, and excavation <br />started on the dam outlet portal. Last, a final route selection <br />for the Navajo Nation Municipal Pipeline was initiated. <br /> <br /><1t> <1t> <1t> <br />
The URL can be used to link to this page
Your browser does not support the video tag.