Laserfiche WebLink
<br />Upper <br />Basin <br />34 Reservoirs <br /> <br />FonteneIle <br /> <br />Flaming Gorge <br /> <br />Coreeanti linit <br /> <br />The reservoir water level will be <br />lowered through the fall and <br />\winter months until a water sur- <br />face elevation of about 6,480 feet <br />is reached. With average runoff <br />during the spring months., Fon- <br />tenelle Reservoir will fill by the <br />end of June. After the spring run. <br />off, the reservoir level will be <br />controlled by adjusting the re- <br />leases th rough the powerpJant to <br />slowly reduce the elevation to <br />6,502 feet by the end of the <br />summer of 1976, (Chart 1.) <br /> <br />At the beginning of water year <br />1976, the active storage in Flam- <br />ing Gorge Reservoir was 3,650,000 <br />acre. feet, with a water surface at <br />elevation 6,037 feet. The reservoir <br />level will be lowered about 10 feet <br />by March of the current year, but <br />should remain high enough until <br />the spring runoff so boats can be <br />launched from all of the nine boat <br />ramps. Average inflow would <br />cause the reservoir to reach eleva- <br />tion 6,035 feet with an active star. <br />age of 3,530,000 acre.feet. Sum. <br />mertime flow in the river below <br />the dam should not exceed 4,500 <br />ft3 / s and would not be less than <br />800 ft3 / s. Releases should average <br />about 150,000 acre-feet per month <br />through September 1976 for a <br />water year total of about 1,900,000 <br />acre. feet. (Chart 2,) <br /> <br />During the current year, the water <br />level in Blue Mesa Resen-oir <br />should reach a low in March 1976 <br />at elevation 7,4.64 feet and the <br />active storage would be 400,000 <br />acre. feet. With average inflow dur- <br />ing the spring of 1976, the reser. <br />voir should fill at elevation 7,519 <br />feet with an active storage of <br />830,000 acre.feet. At that elevation <br />the reservoir has a surface area of <br />9,180 acres and a reservoir length <br />of 24 miles. (Chsrts 3 snd 4.) <br /> <br />Morrow Point Reservoir will be <br />operated near full during the CUT- <br />rent year. Releases of a minimum <br />flow.of 200 ft'/s will be made <br />below the Gunnison Tunnel <br />Diversion Dam for downstream <br />irrigation requirements, power <br />production, and river regulation. <br /> <br /> <br />