My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12193
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:13 PM
Creation date
10/12/2006 5:25:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1975
Author
Missouri River Basin
Title
Draft Report on the Platte River Basin - Nebraska - Level B Study
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />and review of the study conduct as it proceeded from the inventory <br />phase through plan formulation. citizen members provided infor- <br />mation on study activities to constituents in their interest area. <br />Special committees and Consultants <br />Several special committees were formed to aid in conducting <br />certain phases of the study. These committee members were some- <br />times citizens who served without pay, being motivated primarily <br />by their interest in water resources management. <br />Project and Program Financing Committee. This committee was <br />formed to provide guidance and review the findings of a contractor <br />investigating possibilities for funding water resources projects. <br />Its members met periodically to review completed analyses and <br />suggest additional areas for consideration. Members of the <br />committee were representatives of state and federal agencies, <br />insurance and investment companies, university staff, and Natural <br />Resource Districts. <br />Consultants. The Nebraska Water Resources Research Institute, <br />located in Lincoln, Nebraska was engaged as a consultant to <br />develop a computer model to screen and optimize the number and <br />size of potential projects for the multiple objectives of irriga- <br />tion, flood control and recreation. This was to be a general model <br />for use throughout the basin in plan formulation activities. How- <br />ever, the timing of the model development and schedule requirements <br />precluded its use outside the Elkhorn Subbasin. <br />The same consultant was also engaged to investigate additional <br />funding possibilities as discussed previously. Many of the data <br />were obtained from state and federal agencies with proposals made <br />for consideration of suggested potential programs. <br /> <br />1-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.