Laserfiche WebLink
<br />002530 <br /> <br />Table <br />~ <br /> <br />16 <br /> <br />16A <br /> <br />17 <br /> <br />20 <br /> <br />21 <br /> <br />22 <br /> <br />Pacific Southwest Water Plan - Estimated <br />Water Supply <br /> <br />Estimate of Colorado River Water Available for <br />Use in the Pacific Southwest at or below <br />Hoover Dam <br /> <br />Pacific Southwest Area - Present and Planned <br />Generating Capacity <br /> <br />18 <br /> <br />Future Power Requirements <br /> <br />19 <br /> <br />Pacific Southwest Water Plan - <br />Estimated Construction Cost <br /> <br />Control Schedule Pacific Southwest Water Plan <br /> <br />Alternative Plans for Conservation and Conveyance <br />of 1,200,000 a.f. Additional Water Annually to <br />Southern California <br /> <br />Average Annual Benefits Developed by the Pacific <br />Southwest Water Plan by Project and Function - <br />laO-year Period of Analysis at 3 Percent Interest <br /> <br />23 <br /> <br />Average Annual Costs of the Pacific Southwest Water <br />Plan - lOa-year Period of Analysis at 3 Percent <br />Interest <br /> <br />24 <br /> <br />Assignment of Annual Equivalent Costs Based on a <br />laO-year Period of Analysis at 3 Percent Interest <br /> <br />25 <br /> <br />Summary of Repayment Analysis <br />Pacific Southwest Water Plan <br /> <br />26 <br /> <br />Composite Payout Study <br />Pacific Southwest Water Plan <br /> <br />vi <br /> <br />Page <br /> <br />IV-9 <br /> <br />IV -11 <br /> <br />V-2 <br /> <br />V-3 <br /> <br />VI-2 <br /> <br />VI-3 <br /> <br />VI-9 <br /> <br />VII-2 <br /> <br />VIl-7 <br /> <br />VII-8 & 8a <br /> <br />VII-IO <br /> <br />VII-12 <br />