My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12165
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12165
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:05 PM
Creation date
10/12/2006 5:25:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
8/1/1963
Author
PSIAC
Title
Pacific Southwest Water Plan - Report - August 1963
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />on2527 <br /> <br />. <br /> <br />Indian reservations <br />Colorado River Main Stream projects <br />Phase II - Continuing Project Development <br />Alternative Plans <br />Fish and Wildlife and Recreation <br />Fish and Wildlife <br />Basic recreation facilities <br />Planning Program <br />Priority of Planning <br />Water Interchange Projects <br />Tributary Projects <br />Future Desalting Projects <br />Water Reclamation and Quality Control Projects <br />Rehabilitation and Betterment Projects <br />Ground-Water Projects <br />Power Supply Projects <br />Basis of Estimates of Water and Power Supplies <br /> <br />CHAPTER VII - ECONOMIC AND FINANCIAL ANALYSIS <br /> <br />Benef it s <br />Irrigation Benefits <br />Municipal and Industrial Benefits <br />Power Benefits <br />Flood Control Benefits <br />Fish and Wildlife Benefits <br />Recreation Benefits <br />Area Redevelopment Benefits <br />Economic Costs <br />Benefit-Cost Ratio <br />Repayment Analysis <br />Cost Allocation <br />Payout Study <br />Irrigation <br />Municipal and Industrial <br />Commercial Power <br /> <br />CHAPTER VIII - IMPLEMENTATION OF THE PLAN <br /> <br />The Pacific Southwest Development Fund <br />Exchange or Replacement of Water <br />Reclamation and Reuse of Water <br />Satvage of Distribution Losses <br />Salvage of Channel Losses <br />Agricultural Uses <br />Immediate-Action Program <br />Continuing Project Development Program <br />Priority Planning Program <br />Corollary Construction <br /> <br />iii <br /> <br />Page <br />VI-5 <br />VI-5 <br />VI-6 <br />VI-7 <br />VI-12 <br />VI-12 <br />VI-12 <br />VI-13 <br />VI-13 <br />VI-14 <br />Vl-14 <br />VI-14 <br />VI-14 <br />VI-15 <br />VI-16 <br />VI-16 <br />VI-17 <br /> <br />VlI -1 <br /> <br />VII-l <br />VII-l <br />VII- 3 <br />VII-3 <br />Vll-3 <br />Vll- 4 <br />VII- 4 <br />VII- 5 <br />Vll- 5 <br />VII-6 <br />VII- 6 <br />VII- 6 <br />Vll- 6 <br />VII-9 <br />VII.9 <br />VlI-ll <br /> <br />VIlI-l <br /> <br />VIl1-2 <br />VII 1- 3 <br />VlI 1- 4 <br />VII 1- 4 <br />VI 11- 4 <br />VlII-4 <br />VIII - 5 <br />VIII - 6 <br />VI11-B <br />V11I-B <br />
The URL can be used to link to this page
Your browser does not support the video tag.