My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12164
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:05 PM
Creation date
10/12/2006 5:25:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP General Publications
Basin
Colorado Mainstem
Date
3/1/1988
Author
USFWS
Title
Priority Reaches for Investigating Water Rights Acquisition in the Upper Colorado River Basin
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Table 1. Water projects that have undergone Section 7 consultation on the <br />Colorado River but were not yet online as of 1988 and are included <br />in the environmental baseline.* <br /> <br />Project Name <br /> <br />Homestake Diversion <br />Battlement Mesa <br />Storm King Mine <br />Colony Oil Shale <br />Kobe Project <br />GCC/CCSOP <br />Union Parachute Creek Oil Shale <br />Mobile Parachute Shale Oil <br />Pacific Shale Oil Project <br />Vail Expansion <br />Keystone Arapahoe Basin Snowmaking <br />Shoshone Pump back <br />Ruedi Round II/Green Mountain Water Sales <br />Two Forks Project <br />Williams Fork Project <br /> <br />Depletion KAF <br />20.00 <br />1.20 <br />.36 <br />8.00 <br />l.80 <br />66.70 <br />13.00 <br />2l. 50 <br />24.60 <br />.12 <br />.11 <br />.48 <br />38.04 <br />46.90 <br />7.50 <br />250.31 <br />18.00 <br />.01 <br />.03 <br />.48 <br />.14 <br />18.66 <br />6.30 <br />1.20 <br />7.50 <br />.43 <br />106.00 <br />106.43 <br /> <br />TOTAL ABOVE PALISADE: <br /> <br />Dallas Creek <br />Mount Gunnison Mine <br />Colorado Westmoreland Mine <br />Overland Dam <br />Crested Butte Snowmaking <br /> <br />TOTAL FOR THE GUNNISON RIVER: <br /> <br />GCC/CCSOP Lorna <br />Ridges Subdivision <br /> <br />TOTAL ABOVE STATELINE: <br /> <br />Nucla Fluidized Bed <br />Dolores Project <br /> <br />TOTAL FOR DOLORES RIVER: <br />TOTAL ABOVE THE CISCO GAGE: <br /> <br />250.31 <br /> <br />18.66 <br /> <br />7.50 <br /> <br />106.43 <br />382.90 <br /> <br />* The Dominguez and West Divide Projects are not included in the <br />environmental baseline. A memorandum from the Bureau of Reclamation dated <br />April 30, 1986, indicated that these projects would not be implemented in <br />the configuration which was evaluated by the Service in the biological <br />opinions issued for these projects. On this basis, the Service determined <br />that the existing biological opinions for these projects were no longer <br />valid and, as result, depletions associated with these projects were <br />removed form the environmental baseline. <br /> <br />KAF = Thousand Acre-feet <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.