My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12144
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:01 PM
Creation date
10/12/2006 5:24:50 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.200
Description
Paradox Valley Unit - Colorado River Basin Salinity Control Project
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
8/1/1980
Title
Status Report on the Current Results of the On-Going Well Field Testing Program and the Feasibility of Brine Disposal by Deep Well Injection
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />Paradox Valley Unit <br /> <br />I,ell Field Pump Testing Program <br /> <br />The pump testing program began in November 1978 when test <br /> <br />"ell 2el was initially pumped. This well was pumped at a rate of <br /> <br />S~O gpm from ~ovember 1978 to March 1979. The pump was shut down <br /> <br />to facilitate installation of equipment in the well field and <br /> <br />because pump test data interpretation showed little apparent effect <br /> <br />on the brine levels or inflows to the river. But recent interpre- <br /> <br />tation using additional data shows that salt pickup throughout the <br /> <br />wel1 field was reduced during the pump testing period. Notice the <br /> <br />January and February 1979 levels of salt pickup as compared to the <br /> <br />seven year average on attached Figure 5. <br /> <br />The installation of all electrical, pumping, and pipeline <br /> <br />equipment was completed throughout year 1979. Pump testing was <br /> <br />started in December 1979 with test wel1s lOW, 7W, 6E, 7E, and 8E <br /> <br />in the downstream (lower) well field producing 150 gpm. This <br /> <br />operation was continued through January 1980 with little or no <br /> <br />noticeable changes to brine levels or inflows to the river. <br /> <br />Several wells in the upstream (upper) well field were put into <br /> <br />production in February. Test wells lW, 2W, 3W, 4W, and 2E along <br /> <br />with the lower "ell field wells were producing a total flow rate <br /> <br />of 570 gpm. In March, all the test wells were put into production <br /> <br />with the exception of 2Cl and 2E which developed pump and motor <br /> <br />o Qr4l3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.