My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12141
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:20:01 PM
Creation date
10/12/2006 5:24:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.300.40.A
Description
Colorado River Compact
Basin
Colorado Mainstem
Date
3/27/1922
Author
Colorado River Com.
Title
Report of the Colorado River Commission Session Held at the State Capitol of Utah
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~'ilil1c-3 have 'l~''''''l~ll.e with tlle Pederel ?ov:er Gommission <br /> <br />'.; <br />/' <br /> <br />on the Green ihver [.;;,1 .L ts tri brt<::ries. \Ihich re:present approx- <br /> <br />ima'tely 750.000 H .P. of contimlOUi3 power when the rit"er flow <br /> <br /> <br />is adequately equblized br the construction of the necessery <br /> <br />da'111. ~his )ower Will oe within easy transmission distance of a <br />all parts of the State. <.nd tlle major ind1.<s tric.l centers of <br />the State can be rsachei much more readily from power plents <br /> <br />built on the Green rliver than from those now contr.m)leted on <br /> <br />Colorado i1iver. <br /> <br />It so ha::?ens th:;t tl~e Green rti ver lenis i tsel:t. to E ::>ro- <br /> <br />gram of economir.al develo,ment requiring. as ohis would. the in- <br /> <br />vestment of a very 113 rge sum of money long befure it could by <br /> <br />eny possibility become ~emunerative. the Green not only ~ermits <br /> <br /> <br />.1 but requires a de\l'eJ.o:O!:lent by wnzo r.1ight be termed the "dam and <br /> <br /> <br />:oond" method, ,,"hereby its power )OSSibilities can be developed in <br /> <br />res'Jonse 00 gTol"ing :?owc,r deme-nds. At the Same time. so 'far as <br /> <br />our prel~minary investig~tions show. each individual development <br />0::: <br />will be/sufficient size to lJelrmit Qf cOt:stn1ction on a reasonable <br /> <br />cost basis. <br /> <br />The Emount of power above mentioneo. looks liJ:e a lerge - <br />figure and of course it will tal~e a number of years b9iore the <br /> <br />looal market requires ~n;ch an am01cnt of power. However, it is of <br /> <br />interest to note that the power system With 1'!hich I an connected <br /> <br />J.L. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.