My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12116
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:56 PM
Creation date
10/12/2006 5:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Date
1/1/1981
Author
Wright Water Enginee
Title
Operational Study of Ruedi Reservoir Releases For Dow Pumping Plant and Pipeline Replacement Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />s;;2Z8 <br />An operational study was performed in which periods were identified when the <br />Colony Project would require replacement water from Ruedi Reservoir using <br />the Colorado River Simulation Model developed in 1977 by David E. Fleming. <br />The amount of replacement water needed for those periods was determined by <br />making assumptions concerning the initial level of water use by the Colony <br />Shale Oil Project and assuming a transport loss rate between Ruedi Reservoir <br />and the Dow Pumping Plant and Pipeline, which provides water to the <br />proj ect. <br /> <br />.Finally, the replacement water requirements of the Colony Shale Oi1 Project <br />were superimposed on the operation of Ruedi Reservoir. <br /> <br />(i i ) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.