My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12116
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:56 PM
Creation date
10/12/2006 5:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Date
1/1/1981
Author
Wright Water Enginee
Title
Operational Study of Ruedi Reservoir Releases For Dow Pumping Plant and Pipeline Replacement Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. ,.,,, ',' <br />:Ji.."c " <br /> <br />SECTION IV - DETAILED OPERATIONAL STUDY <br /> <br />A monthly operational study of the diversions for Dow Pumping Plant and <br />Pipeline was conducted to determine the quantity and timing of depletions to <br />the Colorado River as a result of pumping the 15 cfs. The operational study <br />also shows the amount and timing of releases from Ruedi Reservoir which will <br />be required. Data from the operational study are summarized in Table 3. <br /> <br />The diversions for the Dow Pumping Plant and Pipeline will be 100 percent <br />consumptively used and depletions will equal diversions. <br /> <br />Using Table E-1 of the 1977 CORSIM II simulation study for the years 1941- <br />1970 ("Dow Pumping Plant and Pipeline Monthly Direct Diversion Yields"), the <br />periods were identified when the pipeline diversion would be called out and <br />replacement water for the Dow diversion required. The timinq and amount at <br />the Dow diversion pOint of those replacement requirements are shown in <br />Column 3 of Table 3. <br /> <br />As indicated above, the operational study assumes a river loss of 5 percent, <br />and thus the replacement requirement at the Dow diversion point is 95 per- <br />cent of Ruedi releases. The required releases and the timing of those <br />releases are shown in Column 4 of Table 3, and the amount of water lost to <br />the river is shown in Column 5 of Table 3. <br /> <br /> <br />(11) <br />
The URL can be used to link to this page
Your browser does not support the video tag.