My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12116
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12116
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:56 PM
Creation date
10/12/2006 5:24:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Date
1/1/1981
Author
Wright Water Enginee
Title
Operational Study of Ruedi Reservoir Releases For Dow Pumping Plant and Pipeline Replacement Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br /> <br />Ii" ~ /r- _~ <br />.J 4 .J'i <br /> <br /> <br />Present operating practice calls for releases from November through March to <br />lower the reservoir to elevation 7706 by April 30. Releases are based on <br />predictions of inflows during that period. After April 30 the reservoir is <br />fi lled to capacity at elevation 7766 by spring runoff. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />The expressed purposes of the Ruedi Reservoi r are to provi de rep 1 acement <br />storage for diversions to the Arkansas River to protect western slope users <br />and to provide storage water for agricultural, industrial, and municipal <br />uses. Because full diversions have not been made to the Arkansas and no <br />long term sales of Ruedi water have been made, the reservoir is presently <br />operated to satisfy the incidental purposes of recreation and flood control. <br />While to date no long term contracts have been entered into, short term <br />sales of Ruedi Reservoir water have been made to the Colorado Highway <br />Department, the Battlement Mesa development and others. <br /> <br />In order to provide flood control storage space in the reservoir, releases <br />have been made in excess of the minimum required and fish bypass flows have <br />been maintained even when they were greater than the undepleted inflow. It <br />is anticipated that releases will more closely conform to the operating plan <br />as sales are made of Ruedi water and facilities are completed for increased <br />diversions to the Arkansas. <br /> <br />(4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.