Laserfiche WebLink
<br />.... <br />co <br />.::.. <br />Gl <br /> <br />purchase 01 half of the stalion's <br />power The lour. unit Dineh plant <br />in the coal. rich San Juan Basin is <br />expected to cost more than <br />55 billion Partners are fhe <br />Navajo Tribe. Bechtel North <br />American Power Corp, Combus- <br />tion Engineering. fne . and Public <br />Service Co of New Mexico. <br />General Electric Co dropped <br />out. but the Japanese trading <br />firm, Marubeni Corp is thinking <br />01 participating Bechtel will <br />design and build the plant while <br />CE will supply generators and <br />other components <br />Reprinttd hom €NR, June 11 '987 <br /> <br />Progress in Paradox <br />Valley <br /> <br />Reclamation has temporarily <br />terminated the drilling of the well <br />al 14.057 leel They are enlarg. <br />ing the wen bore and intend fa <br />proceed with the inSlallation of <br />well casing They have drilled <br />through 250 leel of salt found in <br />tlnee separate lones Theyafe <br />now a lew leet into Leadville lime. <br />slone Once the casing is ceo <br />menled inlo place lrom top to <br />bottom. they will proceed wilh <br />core drilling lor an addilional <br />1,000 to 1.500 leet InlO the Lead- <br />ville formation <br />The Leadville is expected to <br />be the formation that will receivE' <br />the injecled saline brines Once <br />they have completed their core <br />drilling, they will analyze the <br />materials, select zones that 1001< <br />to be most permeable, insert the <br />special alloy liner, cement the <br />liner in place. perforate the liner <br />with shot, and develop the lime. <br />slone with acid At this point. Ihe <br />basic we-ll construction will be <br />complet€'d and the w~t will be <br />ready lor injection tesls <br /> <br />UTA>< <br /> <br />"""",A <br /> <br />..-.......-..,... <br /> <br />-" <br /> <br />~- "- <br />. "- . <br />..~..::-. <br />'.V_" ~ <br /> <br />\": <br /> <br />. <br /> <br />y <br /> <br />CAlF <br /> <br />1..,.. 0. <br /> <br />'..,v_ <br /> <br />...~"'" ~ <br />\ <br /> <br />'~_.,"- <br /> <br />.--..- <br />s.o-.c-.....~. <br />0=. <br />_ilL" <br /> <br /> <br />Forum's triennial <br />standards review <br /> <br />The 19B7 Review 01 Weier <br />Quality Standards lor Salinity - <br />Colorado River System is <br />complete and tlas been dis- <br />tributed 10 Federal. State, and <br />local agencies and individuals. <br />The publication, prepared by the <br /> <br />". <br /> <br />W~ <br /> <br />, <br />\ .. <br />, . <br /> <br />. <br /> <br />_.'''"- <br />. <br /> <br />~".- .. <br />n._"...."!' <br /> <br />+ <br /> <br />-+ , <br />, <br /> <br />-. ..".~;,~-- <br />..,;_...,.... <br />~...._, ""~_ cao <br /> <br />., <br /> <br />'. 0.. .~. <br /> <br />, <br />, <br /> <br />""_~,- <br />. <br /> <br />n......<~'".. <br /> <br />.~ .~..- <br /> <br />;"I~ZU..\ <br /> <br />""W <br />"EX <br /> <br />J~ <br /> <br />, <br /> <br />Colorado River Basin Salinity <br />Control Forum. will be lhe sub- <br />ject of public meetings in Vernal. <br />Utah. on July 20. 1987. and Las <br />Vegas. Nevada. on July 22, 19B7 <br />The Utah meeting is scheduled <br />lor 7:00 pm at the Uintah Counly <br />Court House and the Nevada <br />meeting will be at 1 00 pm in the <br />Board Room of the Clark County <br />School District <br /> <br />'. . <br />