My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12086
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12086
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:49 PM
Creation date
10/12/2006 5:23:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.800.A
Description
Metro Study SB 96-74
State
CO
Basin
South Platte
Date
4/1/1998
Author
CWCB
Title
Denver Basin and South Platte River Basin Technical Study, Technical Addendum 1 and 2, Senate Bill 96-074
Water Supply Pro - Doc Type
Publication
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter 1: South Platte Basin Inventory <br /> <br />March 21,1998 <br />Page 1-6 <br /> <br />Hydrosphere Resource Consullants, 1002 Walnut Sulle 200, Boulder, CO 80302 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1,1.2,4 South Platte at Henderson <br /> <br />For this gage location we estimated natural flows based on Denver's natural flow <br />estimates, but with an adjustment for Clear Creek, To develop natural flow estimates <br />for this location, Denver used the following general equation: <br /> <br />South Platte at Henderson natural flow = <br />South Platte at South Platte natural flow + <br />Plum Creek at Louviers historical gage flow + <br />Bear Creek at Morrison historical gage flow + <br />Cherry Creek Below Cherry Creek Lake gage flow + <br />Clear Creek At Mouth Near Derby + <br />(natural stream gains between South Platte at South Platte gage <br />and South Platte at Henderson gage) <br /> <br />Denver quantified the natural stream gains between the South Platte and <br />Henderson gages via mass balance analysis using daily data for stream flows, <br />diversions, wastewater and power plant discharges, changes in reservoir storage and <br />reservoir evaporation within this reach. <br /> <br />We believe that Denver's use of historical gage data for Clear Creek At Mouth <br />results in a significant under-estimation of natural flow at Henderson. The Clear Creek <br />At Mouth gage reflects diversions by several major agricultural, municipal and industrial <br />users. A better choice would be the Clear Creek Near Golden gage, which has only <br />very minor diversions occurring above it. The average annual flow at Clear Creek Near <br />Golden is approximately 100,000 acre-feet greater than that at Clear Creek At Mouth, <br />We therefore adjusted Denver's natural flow estimate for the Henderson gage by <br />subtracting Clear Creek At Mouth and adding Clear Creek Near Golden. The historical <br />period of record for the Clear Creek Near Golden gage covers only from 1909 to 1974. <br />We extended this period of record through 1980 via correlation with natural flow <br />estimates for Boulder Creek at 75lt1 Street (see below). We believe that the resulting <br />estimates for this location are the best available data and are satisfactory for the <br />purposes of this study. Natural flows estimates for the South Platte at Henderson gage <br />location are presented in Table 1-4 and Figure 1-4. <br /> <br />1.1.2.5 South Platte at Kersey <br /> <br />To develop natural flow estimates for this location, we used the following <br />equation: <br /> <br />South Platte at Kersey natural flow = <br />South Platte at Henderson natural flow + <br />Boulder Creek at 75U1 Street natural flow + <br />
The URL can be used to link to this page
Your browser does not support the video tag.