My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12043
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:42 PM
Creation date
10/12/2006 5:21:40 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.200
Description
Narrows Unit - Mailing Lists and Correspondence
State
CO
Basin
South Platte
Water Division
1
Date
9/13/1951
Author
CWCB
Title
Compilation of Data and Information on Proposed Narrows Reservoir Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'JOe" <br />,.....) U.L <br /> <br />-31- <br /> <br />The directors of the First National Bank of Fort i.;organ wish to take an unequivocal <br />stand in opposition to the construction of the NarroVls Da'll or any other dam on the <br />"latte River in Horgan County for the foUm'1i.ng reasons: <br /> <br />~, <br />'f <br />I, <br /> <br />1. Loss of the rich ~:.reldona farm land vlhich would be eliminated by the water <br />would be irreplaceable. <br /> <br />'.: <br /> <br />2. Several other sites for placing a dam in the South Platte River would be <br />more feasible in Weld County. <br /> <br />3. We believe the entire country would obtain more direct benefit from the <br />placing of smaller dams on the tributaries of the datte P,iver rather than <br />a massive dam of the i-'latte. For example, we favor placing of several darns <br />on the headwaters of the Bijou and Kiowa Cree~s for flood control. This <br />method would allow the water to filter into undergrow1d streams and re- <br />plenish the irriga tion water supply in the Wiggins area. <br /> <br />4. We believe the cost of any such darn here at the N<.rrows site would greatly <br />exceed economical benefits for areas tributary to the South ?latte River. <br /> <br />5. Loss of the l.eldona business tributary to Fort ;.!organ would be irreplaceable. <br /> <br />6. Loss of t3..X )"""~nue by the purchase of this property by the Feclcral Govern- <br />mer,t would be i.rrej::lacea't,le to the economic welfare of Horgan County. <br /> <br />The First National Bank of Fort l.;organ, as an institution, and the Board of <br />Direc':,ors, and as directors individually wish to make kno'<m at this time they <br />ar" opj::osed to the construction of any dam in the Sodh F'latte River in Morgan <br />,County. <br /> <br />Sincerely yours, <br /> <br />RB:tt <br /> <br />/Si',oyden Grown <br />Hoyden Brmm <br />President <br /> <br />. <br />, <br />f. <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.