Laserfiche WebLink
<br />o <br />o <br />('-,1 <br />m <br />.0 <br />CoO <br /> <br />estimate water yields for alternative Joint-Use Reservoirs and alternative Green Mountain Reservoir <br /> <br /> <br />water exchange projects and to develop preliminary designs and cost estimates based on an <br /> <br /> <br />approximately uniform level of investigation. This information is required prior to any decision on <br /> <br /> <br />the next level of development of these projects. <br /> <br />This Study has been conducted in three phases. In the first phase, existing data was <br /> <br />collected and evaluated for initial screening of nine reservoir sites identified by the Authority as <br /> <br />candidates for Joint-Use or Replacement Reservoirs. The candidate reservoir sites for this study <br /> <br />were selected based on the existence of a water right or claimed water right at the site and previous <br /> <br />studies conducted by the Colorado River Water Conservation District, the Denver Water Board, the <br /> <br />U.S. Bureau of Reclamation and others. The site seiection was also based on geographic location <br /> <br />within the Colorado River drainage. The reservoir sites are displayed on Figure 1.1. <br /> <br />In conjunction with reservoir site evaluations, three alternative conveyance routes from <br /> <br />Green Mountain Reservoir to Dillon Reservoir were appraised to determine a "Green Mountain <br /> <br /> <br />Pumpback System" configuration as part of the Green Mountain Exchange Project. The screening <br /> <br /> <br />resulted in the selection of a pipeline route along Colorado HighwllY 9 for conveyance of water from <br /> <br />Green Mountain Reservoir to Dillon Reservoir, and selection of the following six reservoir sites for <br /> <br />further study. <br /> <br />o Wolford Mountain Site A' on. Muddy Creek <br /> <br /> <br />o Wolford Mountain Site C on Muddy Creek <br /> <br />o Red Mountain Site on the Colorado River <br /> <br /> <br />o Azure Site on the Colorado River <br /> <br />o Woicott Site on Alkali Creek <br /> <br /> <br />o Una Site on the Colorado River <br /> <br />The second phase consisted of hydrologic, operational and water rights analyses using a <br /> <br />hydrologic simulation model. The third phase of the Study involved preliminary geotechnical <br /> <br />investigations, core drilling at the Wolford Mountain Site A' and the Red Mountain Site, and <br /> <br />subsurface investigation of the conveyance route. The third phase also included developing <br /> <br /> <br />reconnaissance_level project designs, cost estimates ana cost-yield relationships for comparisons of <br /> <br />alternative reservoirs and reservoir combinations. The Study is concluded with this Finai Report and <br /> <br /> <br />Appendixes. A Summary Report, under separate cover, summarizes this Final Report. Recognizing <br /> <br />2 <br />