My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12030
CWCB
>
Water Supply Protection
>
Backfile
>
12000-12999
>
WSP12030
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:39 PM
Creation date
10/12/2006 5:21:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Final Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br />1 0 <br /> <::) <br />"'] (-, <br />'" <br /> C.0 <br />"'j 00 <br />, <br />] <br />-., <br />, <br />I <br />~] <br />] <br />'1 <br />I <br />1 <br />, <br />I <br /> <br />1 <br />., <br /> <br />1 <br />I <br />l <br /> <br />,] <br />"1 <br /> <br />/t '\ <br /> <br /> <br />TABLE S.5 <br /> <br />COST OF EXCHANGE PROJECT WATER <br />AVAILABLE TO ROBERTS TUNNEL <br /> <br />PROJECT 1) <br />REPLACEMENT <br />RESERVOIR(S) <br /> <br />AVERAGE 2) <br />CONVEYANCE <br />SYSTEM FLOW <br />(1000 af/yr) <br /> <br />EXCHANGE <br />PROJECT <br />YIELD <br />(1000 af/yr) <br /> <br />TOTAL 3) <br />COST <br />PER YEAR <br />($1,000,000) <br /> <br />UNIT4) <br />COST OF <br />WATER <br />($/af) <br /> <br />Wolcott w/diversion from <br />Eagle & Colo. <br /> <br />113 <br /> <br />$ 93.8 <br /> <br />$ 790 <br /> <br />119 <br /> <br />Red Mountain & Una <br /> <br />119 <br /> <br />124 <br /> <br />68.4 <br /> <br />550 <br /> <br />Una & Wolford Mountain A' <br />w/Colo. diversion <br /> <br />119 <br /> <br />, 124 <br /> <br />64.7 <br /> <br />520 <br /> <br />Azure & Wolcott <br />w/Eagle diversion <br /> <br />87 <br /> <br />101 <br /> <br />61.4 <br /> <br />610 <br /> <br />Red Mountain & Wolcott <br />wlEagle diversion <br /> <br />81 <br /> <br />93 <br /> <br />62.7 <br /> <br />670 <br /> <br />1) Diversion involves pumping from Colorado R. or Eagle R. or both rivers, as cited. <br /> <br />2) <br /> <br />The 8000 af/mo conveyance system was combined with the Azure-Wolcott and Red <br />Mountain-Wolcott replacement reservoirs. The 12,000 af/mo system was combined with the <br />Wolcott/Eagle-Colo., Red Mountain-Una and Una-Wolford A' replacements reservoirs. <br /> <br />3) <br /> <br />Total cost per year is the sum of yearly debt service, average electrical power and other <br />operating costs from Table S.3for the listed reservoir(s) and the corresponding conveyance <br />system. <br /> <br />4) <br /> <br />Estimated cost per acre-foot of project water delivered in a year of average operating costs. <br /> <br />In addition to supplying water to Dillon Reservoir by pumping from Green Mountain <br /> <br />i <br />! Reservoir, the water exchange concept would allow water to be retained in Dillon Reservoir that <br />i <br /> <br />under current water rights priorities must be released to Green Mountain Reservoir. It should be <br /> <br /> <br />noted that the estimated average annual project yields differ from the firm yields expected from the <br /> <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.