My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12025
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP12025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:38 PM
Creation date
10/12/2006 5:21:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.300
Description
Miscellaneous Small Projects and Project Studies - USGS - Pinon Canyon Maneuver Site
State
CO
Basin
Arkansas
Water Division
2
Date
10/1/1951
Author
Corps of Engineers
Title
Project Report on Pinon Canon Dam - Trinidad Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />0471 <br /> <br />10-02. Man-hours of employment. .- Construction of. the Pinon Canon <br />Dam would provide a total of about tiS ,000 man-hours of employment with <br />40,000 man-hours classified as direct llon"s.;i.te" la'borand. 45,000 man- <br />hours as indirect "o!f-site" > labor. The distribution of the miu'i;;'hours <br />, of labor is shown 'in table 2. <br /> <br />TABLE .2 <br />ESTIJ'I'l,TEDAMOUNT OF E~iJPlOYMENl' <br /> <br /># . ~ <br /> <br />Type of Emplo;vtnent. <br /> <br />Man-hours <br /> <br />. , <br /> <br />Direct - "On-site": <br />Skilled labor ' <br />Unskilled :Labor <br />Other laJ:>or ,'; (),> , <br />'1 .",'. ~.. i.!. :.,.t <br /> <br />18,000 <br />12,Oob <br />10,000 <br /> <br />Total - Direct man-hourS <br /> <br />40,000 <br />45,000 <br />85,000 <br /> <br />Indirect - "Off-site" <br /> <br />Total - Direct and Indirect <br /> <br />XI - OPERi-TION J,ND HilINTEW.NCE <br /> <br />11-01. Operation and maintenance. - Maintenance and operation of <br />the project works would be the responsibility of local interests in <br />accordance with regulations prescribed by the Secretary of the ilrrrry. <br />This work would consist of periodic inspection, cleaning, and mainte- <br />nance of the structures, Cost of annual maintenance and operation is <br />estimated at (>500. ' <br /> <br />XII - ECONOMIC STUDIES <br /> <br />12-01. Economic studies. - The economic studies prepared for the <br />preliminary reconnaissance report consisted prinCipally of a review of <br />the flood damage survey submitted qy the city of Trinidad. Economic <br />studies, including a field investigation of the area subject to flood- <br />ing, were made in connection with preparation of this project report <br />in order to determine, (a) the economic conditions in the flood plaih, <br />(b) the flood damages experienced, (c) the monetary benefits that would <br />be creditable to the project, and (d) the ratio of project benefits <br />to. project costs. An area of about 40 acres in the northl~estern and <br />central sections of the city, having aproperty valuation of ~>1,860,000, <br />would be protected, From these studies it was determined that the ratio <br />of benefits to costs 1'01' the Pinon Canon Dam project would be 1..34:1. <br />Details of the economic studies are given in appendix III. ' <br /> <br />.,11- <br /> <br />,> ,.\'~\. ~ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.