Laserfiche WebLink
<br />N <br />c.c> <br />- <br /> <br />concurrently with the Central Arizona Project to insure that provisions <br />of the Colorado River Compact and the vpper Colorado River Basin Compact <br />would be carried out. The Central Arizona project is already under con- <br />struction. <br /> <br />It is therefore, very important that the san Miguel be kept on schedule. <br /> <br />2 <br />