Laserfiche WebLink
<br />.' <br /> <br />o <br />en <br />.t:>. <br />l\) <br /> <br />(2) Section 403f~) of the Colorado River Basin Project <br />Act (82 Stat. 896) a is hereby amended as follows: <br />strike the word "and" after the word "Act," in line 8; <br />insert after the word "Act," the following "(2) for <br />repayment to the general fund of the Treasury the <br />costs of each salinity control unit or separable <br />feature thereof, THE COSTS OF MEASURES TO REPLACE <br />INCIDENTAL WILDLIFE VALUES FOREGONE, AND THE COSTS OF <br />ON-FARM MEASURES payable from the Lower Colorado <br />Basin Development Fund in accordance with sections <br />205(a)(2), 205(a)(3), 205(a)(4), 205(a)(5), and 205(b)(1) <br />of the Colorado River Salinity Control Act and"; AND change <br />paragraph (2) to paragraph '(3). <br /> <br />(c) Costs of construction, operation, maintenance, <br />and replacement of each unit or separable feature <br />thereof AUTHORIZED BY SECTION 202(a), COSTS OF CONSTRUC- <br />TION, OPERATION, AND MAINTENANCE OF MEASURES TO <br />REPLACE INCIDENTAL WILDLIFE VALUES FOREGONE AUTHORIZED <br />BY SECtION 202(b)(2), AND COSTS OF IMPLEMENTATION OF <br />THE ON-FARM MEASURES AUTHORIZED BY SECTION 202(c) <br />allocated for repayment by the upper basin under <br />section 205(a)(2) of this title shall be paid in <br />accordance with section 205(d) of this title from the <br />Upper Colorado River Basin Fund within the limit <br />of the funds made avail able under section 205(e) of <br />this title. <br /> <br />(d) Section Sid) of the Colorado River Storage Project Act <br />(70 Stat. 108)13B is hereby amended as follows: strike <br />the word "and" at the end of paragraph (3); strike the <br />period after the word "years" at the end of paragraph (4) <br />and insert a semicolon in lieu thereof followed by the <br />word "and"; AND add a new paragraph (5) read i ng: <br /> <br />"(5) the costs of each salinity control unit or <br />separable features thereof, THE COSTS OF MEASURES <br />TO REPLACE INCIDENTAL WILDLIFE VALUES FOREGONE, AND <br />THE COSTS OF THE ON-FARM MEASURES payable from the <br />Upper Colorado River Basin Fund in accordance with <br />sections 205(a)(2), 205(a)(3), 205(a)(4), 205(a){5), <br />and 205(c) of the Colorado River Salinity Control Act." <br /> <br />(e) The Secretary is authorized to make upward adjustments <br />in rates charged for electrical energy under all contracts <br />administered by the Secretary under the Colorado River Storage <br />Project Act (70 Stat. 105, 43 U.S.C. 620) as soon as practicable <br /> <br />l133ba 43 USCA & l543(g) <br />43 USCA & 620d(d), (3) to (5) <br /> <br />13 <br /> <br />43 USC 1543 ' <br /> <br />43 USC 620d <br /> <br />t <br />