Laserfiche WebLink
<br />~ <br /> <br />., <br /> <br />3. Interpret photographs, transfer to mylar, digitize, assign attributes <br />and develop base map. (BR) <br /> <br />4. Search for soil and geology data. Transfer to GIS data base. (BR) <br /> <br />5. Digitize contours and incorporate into GIS data base. (BR) <br /> <br />6. Acquire peak, spring runoff with videography. Include 1 kID'buffer <br />around the river. (BR) <br /> <br />7. Set up study sites for detailed quantification of habitat types (FWS) <br /> <br />8. Interpret videography and transfer to GIS. (BR) <br /> <br />9. Acquire base-flow videography. Include 1 kilometer buffer around the <br />river. (This flight will be combined with the flight made during the <br />Standardized Monitoring Program to reduce costs) (BR) <br /> <br />10. Delineate specific habitat types on aerial photographs at time of <br />videography flight. (FWS) <br /> <br />11. Interpret videography and transfer to GIS. (BR) <br /> <br />12. Integrate videography and CIR aerial photography in the GIS. Analyze <br />data, produce map plots, and provide interim and final reports. (SR, <br />FWS) , <br /> <br />VII, Study Schedule (start/end by Task) <br /> <br />1. October 1991 <br />2. October 1991 <br />3. November 1991/January 1992 <br />4. November 1991/January 1992 <br />5. November 1991/January 1992 <br />6. May 1992/1993/1994 <br />7. July-August 1992 <br />8. June-August 1992/1993/1994 <br />9. August 1992/1993/1994 <br />10. September 1992 <br />11. September-November 1992/1993/1994 <br />12. November-December 1992/1993/1994 <br /> <br />VIII. FY 1 Work <br /> <br />Fish and Wildlife Service <br />Set up study sites, ground truth aerial videography, summarize <br />available habitat types <br /> <br />labor <br />Travel and per diem <br />Materials and miscellaneous <br />subtota 1 <br /> <br />$16,000 <br />2,000 <br />1. 000 <br />$19,000 <br /> <br />4 <br />