My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11984
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:31 PM
Creation date
10/12/2006 5:20:00 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
7630.175
Description
Wild and Scenic-Dolores River
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/25/1975
Author
Bureau Outdoor Rec
Title
Dolores Study-Wild and Scenic-Corresp Reports tech etc 1968-81-Dolores Wild and Scenic River Study MBO Work Plan-Draft
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ATTAC~IENT B (Con'd.) <br />Page 3 <br /> <br />eM,B,O, WOR[< PLAN · <br />continued <br /> <br />\ <br />EMPlOYEE Donald L. Bock <br /> <br />TASKS REQU IRED TO ACCOMPLISH OBJECTlV E <br /> <br />14. Formulated draft E.Q. and N.E.D. Plans <br />-_____.and prepared preliminary data on <br />Regional Development and Social Well- <br />Being impacts. (All preliminary <br />Task Force inputs due.) <br /> <br />15. <br /> <br />Analyzed, evaluated, and finalized the <br />E.Q. and N.E.D. draft plans. <br /> <br />16. Evaluated effects of the alternatives <br />on the four accounts (EQ, NED, RD, <br />and SWB). <br /> <br />17.--5elected_and_prepared,Recommended-Plan <br /> <br />11A- -2."sr f.J"J,h,{I.J~ff"y) ,rl-rl,rI~:' t!>rG, J, <br />18. Finalized complete' draft report and <br />: ---~omp1eted the-preliminary Environmenta <br />, 'Impact Statement. (Primary BOR effort <br />in this period to be on preliminary <br />EIS.) <br /> <br />19. Completed regional, in-house review <br />of draft report and preliminary EIS <br />and submitted same to Washington for <br />FS and BOR, WASO, and Departmental <br />clearance. <br /> <br />I 20. <br /> <br />Obtained FS & BOR, WASO, -and Depart- <br />mental clearance (for review) of draft <br />report arid preliminary EIS. (FS and <br />BOR, WASO, to have made any necessary <br />changes in report and EIS.) <br /> <br />21. <br /> <br />Printed and submitted draft report and <br />preliminary EIS to WASO for clearance <br />by OEPR. (WASO to distribute draft <br />report and preliminary EIS for reviewJ <br /> <br />OBJECTIVE 1.0. NUMBER <br /> <br />INDIVIDUAL TASKS <br />COMPLETION DATES <br />& COSTS <br />PLANNED ACTUAL <br /> <br />PROGRESS REVIEW <br /> <br />Proguu Gnd/or probl.m1 r.lol,d fa <br />indi..iduol p.rlOfrDOnU or c:ondilions. <br />Chronology of uSlll1I ,caH.c1ive oclif.nl. <br />ncydinQ. .Ic. <br /> <br />6/16/7 <br />36 H.D <br /> <br />6/20/75 <br />24 M.D. <br /> <br />7/1/75 <br />17 M.D. <br /> <br />7/11/75 <br />18 M.D. <br />7/2017.' - (. grJt.~i I r$oe Dii-Fclrmlk. <br />8/1/7 5 <br />38 M.D. <br /> <br />8/8/75 <br />16 M.D. <br /> <br />8/22/75 <br />4 M.D. <br /> <br />9/5/75 <br />12 M.D. <br /> <br />0621 <br />
The URL can be used to link to this page
Your browser does not support the video tag.