My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11967
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11967
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:27 PM
Creation date
10/12/2006 5:19:34 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.A
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/1/1976
Author
Dolores WCD
Title
Dolores Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />mOl1 VtPHEE RESERVOIR TO THE EXISTING SYSTEM OF THE f\'bNTEZlJJIIA VAll.EY <br />IRRIGATION CoMPANY; AND THE TOWAOC CANAL EXTENDING THROUGH THE ~bNTEZlJMI\ <br />VAll.EY TO THE TowAOC AREA. ALL MAIN CANALS WOULD BE OPEN AND EARTHLINED, <br /> <br />SPRINKLER IRRIGATION SYSTEM ARE PLANNED FOR All. OF THE FULL SERVICE <br />LAfIDS. LANDS IN THE ESTABLISHED /'bNTEZlf,IA VALLr::r AREA !'fOULD CONTINUE TO <br />BE SERVED BY EXISTING GRAVITY SYSTEMS, THE SPRINKLER SYSTEM FOR THE <br />!bVE CREEK AREA WOULD INCLUDE SIX PUMPI[\,'G PLANTS TO PROVIDE PRESSURE AT <br />FARM TURNOUTS. IN THE TOWAOC MEA, PRESSURE WOULD BE DEVELOPED IN THE <br />PIPE LATERAL SYSTEM FROM THE GROUND SLOPE. THE LATERAL SYSTEMS WOULD BE <br />ASBESTOS CEMENT AND CONCRETE PRESSURE PIPES AND \\UULD BE BURIED TO AID <br />IN PRESERVATION OF THE SCENERY. PROJECT DRAINAGE WIll. BE PROVIDED FOR <br />THE !bVE CREEK AND T OWAOC AREAS. <br /> <br />IRRIGATION SCHEDULING \'IOULD BE IMPLEMENTED ON All. FUll. SERVICE LAND TO <br />ASSURE THE APPLICATION OF THE PROPER AMOUNT OF WATER FOR A GIVEN CROP AT <br />TIlE PROPER TIME. THE IDEAL QUANTITIES AND TIMING OF ll-IE IRRIGATION <br />APPLICATIONS WOULD BE PREDICTED FROl1 ANALYSES OF TEJI'IPERATURE, PRECIPI- <br />TATION, SOlAR RADIATION, AND LOCAL SOIL MOISTURE AND CROP CH/\RACTERISTICS, <br /> <br />r~UNICIPAL AND INDUSTRIAL WATER \'IOULD BE WillE AVAILABLE FROI1 PROJECT <br />FEATURES TO TREATMENT FACILITIES TO BE CONSTRUCTED BY THE !'IATER USERS. <br />THE I'IATER USERS \'IOULD PROVIDE FACILITIES FOR DISTRIBUTlONOF 11-1E WATER, <br />TI'IE PROJECT RESERVOIRS--ftPHEE, fbNUMENT CREEK Am Df-\\'ISON DRAW--A~ID 11-IE <br />TOHEN LAKE DII<ES \'IOULD PROVIDE NEW LAKE FISHERIES, I'IATERFOI'!L f-ll\BITAT <br />AND SIGNIFICANT I'IATER-DRIENTED RECREATIONAL OPPORTUNITIES. BASIC <br />RECREATIO~IAL OPPORTUNITIES \'IOULD BE IMPROVED AT TIlE NARRJ\GUINNEP, TOHEN <br />AND GROU~ID HOG RESERVOIRS WHICH 001'1 PROVIDE IRRIGATION STmAGE FOR THE <br />~bNTEZU~V\ VALLr::r IRRIGATION CoMPANY. THE H'\TER SURFACES OF TI-IESE RESER- <br />voms \','OULD BE STABILIZED AS THE FUNCTIONS OF THE RESERVOIRS FOR IRRI- <br />GATION WATER STORAGE \\OULD BE LARGELY SHIFTED TO ftPHEE RESERVOIR. <br /> <br />~ , <br /> <br />f\EOUT 10 MILES OF A RELATIVELY POOR STREffl FISHERY ON TilE DOLORES RIVER <br />\'.aILD BE FLOODED BY ftPHEE RESERVO I R . THE STREI'I.l FISHERY 1 \II THE RIVER <br />IROI^ITlIE RESERVOIR, HO\','EVER, WOULD BE GREATLY ENI:ANCED AS A RESULT or- <br />PROJECT OPERATIONS, THE FISHERY h'OULD BENEFIT FROM RESERVOIR RELEASES <br />rY~E SPECIFICALLY FOR FISH, FROM CONi ROLLED SPRING RESERVOIR RELEASES <br /> <br />Ii <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.