My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11964
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:27 PM
Creation date
10/12/2006 5:19:19 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee AWRBIAC
Basin
Arkansas
Water Division
2
Date
1/1/1951
Title
Arkansas White Red Basins Inter Agency Committee Procedure Guide First Edition
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Q <br />,....., <br />~ <br /> <br />. <br /> <br />!9. <br />e;tI <br />~ <br />~ <br /> <br />1 January 1951 <br /> <br />Al'lRBIAC PROCEDURE GUIDE <br /> <br />IV. ASSIGNMENT OF WORK (Cont'd) <br /> <br />Mapping. <br /> <br />a. Statement: <br /> <br />" <br /> <br />(1) A plan for mapping inadequately mapped areas for the AWR <br />studies will be prepared as follows: <br /> <br />(a) Existing maps, as inventoried by the Mapping Sub- <br />committee, AvIRBIAC, will be reviewed and evaluated for adequacy. <br /> <br />. <br /> <br />(b) Map requirements over that determined to exist will <br />be referred to the AWR Map Center, U. S. Geological Survey, Department <br />of the Interior, P. O. Box 61, Tulsa, Oklahoma, for verification of <br />their nonexistence and for determination of the possibility of combin- <br />ing the mapping with requirements of other agencies; <br /> <br />(c) Specifications will be prepared for mapping or re- <br />mapping those areas in need thereof. <br /> <br />. <br /> <br />(d) Priorities for mapping will be established. <br />(e) A mapping schedule will be prepared. <br /> <br />(2) A section of the AWR Report showing the status of map- <br />ping, need for additional mapping and proposed program in the three- <br />basin area will be prepared. <br /> <br />b. Assignment: Department of the Interior (U. S. Geological <br />. Survey) <br /> <br />c. Assisting Agencies: States, Corps of Engineers, Agriculture, <br />Commerce (USC & GS). <br /> <br />. <br /> <br />d. Time of Completion: <br /> <br />e. Disposition: New mapping performed in a(l) to be retained <br />in the working files of the respective agencies to support those data <br />contained in sections of the report. Section designated in a(2) to <br />accompany final report to Congress. <br /> <br />. <br /> <br />IV-1S <br />
The URL can be used to link to this page
Your browser does not support the video tag.