Laserfiche WebLink
<br />Reasons for the projected increase include <br />the inflationary rise in present and pro- <br />jected power system operating costs, esti- <br />mated higher costs to complete construc- <br />tion of the authorized storage unit and <br />participating project facilities,! reduction in <br />estimated power revenues because of <br />projected acceleration of water depletions, <br />and the inclusion of future payment from <br />power revenues of a portion of the esti- <br />mated construction and operating costs <br />of four specific authorized Colorado River <br />Salinity Control Projects (P.L 93-320- <br />88 Stat. 266). <br /> <br />Projections using current estimates of CRSP <br />costs, construction schedules and revenues <br />from power sales (including the proposed <br />rate increase), municipal and industrial <br />water sales, payments by irrigators, ad <br />valorem taxes and miscellaneous revenue, <br />show that payment of the reimbursable <br />costs of the authorized projects can be <br />accomplished within the authorized repay- <br />ment periods. <br /> <br />34 <br /> <br /> <br />. '>:f <br />~", <br />\ i <br />\ ~ <br />1;;; <br />~. '4 ! <br />.~, , <br />r' ' <br />, <br />i <br /> <br />';.j <br /> <br />"Hole in the Rock," Lake Powell. <br />