Laserfiche WebLink
<br /> <br />Project Costs Allocated (Excludes Section 8 Costs) <br /> <br />Reimbursable Allocations: <br />Irrigation ................ <br />Power <br />Municipal and Industrial Water ... <br />Other <br /> <br />Total <br /> <br />Nonreimbursable Allocations: <br />Flood Control... <br />Fish and Wildlife ... <br />Recreation ................ <br />Road Relocation Costs, Public Law 87-874 . <br />Total <br /> <br />Other: <br />Navajo Indian Irrigation Projectl . <br />Total Costs Allocated <br /> <br />Section 8 Costs: <br />Fish and Wildlife. <br />Recreation <br /> <br />Total Costs Not Allocated <br />Total <br /> <br />1 Repayment of construction costs is sUbject to the act of July 1, 1932 (47 stat. 564). <br /> <br />(Thousands <br />of Dollars) <br /> <br />941,372 <br />707,026 <br />351,084 <br />3,B09 <br />2,003,291 <br /> <br />17 ,808 <br />100,672 <br />4,976 <br />14,094 <br />137,550 <br /> <br />324,713 <br />2,465,554 <br /> <br />45,466 <br />66,330 <br />111,796 <br />~- <br />2,577,350 <br /> <br />25 <br />