My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11935
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11935
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:21 PM
Creation date
10/12/2006 5:17:48 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Western Slope
Date
1/1/1977
Author
Myron B Holburt
Title
Annual Report for the Calendar Year 1976
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ ~ '-: r~ <br />l. \\) ... .". <br /> <br />will be terminated by 1985. The <br />Board's staff reviewed the proposed <br />notices and recommended some <br />clarifications of definition and the <br />addition of a reference to the future <br />water district proposed for the area. <br />The federal government indicated that <br />it would publish the written notice in <br />the Federal Register and in local <br />newspapers in communities located <br />along the lower Colorado River. <br />In late 1976, the Yuma District <br />Office of the Bureau of Land <br />Management transmitted for review <br />and comment draft copies of a <br />proposed recreation management plan <br />for the Laguna-Martinez area along <br />the lower Colorado River and an <br />environmental analysis. The plan <br />proposed recreation developments but <br />did not propose any means for <br />acquisition of a water supply for the <br />developments. The Board's comments <br />recommended that the plan describe <br />the proposed future water uses in the <br />area and proposed water supply <br />sources, both interim and permanent. <br />Also, it was recommended that <br />mention be made of the 1975 report <br />of the Task Force for Acquisition of a <br />Permanent Water Supply for Bureau <br />of Land Management Programs along <br />the lower Colorado River and the <br />present status of the Department of <br />the Interior's activities to implement <br />the recommendations of that report. <br /> <br />Weather Modification Activities <br /> <br />In 1976, the Bureau of Reclamation <br />proposed a 13-year, $36 million <br />demonstration project to study the <br />seeding of the atmosphere to produce <br />additional precipitation and runoff in <br />the Colorado River Basin. The project <br />would require about three years to <br />plan and install the needed equipment <br />and seeding would be conducted over <br />a 10-year period. The demonstration <br />project will be based on data <br />obtained from and analyses of the <br />results of the recently-completed <br /> <br />14 <br /> <br />5-year Colorado River Basin Pilot <br />Project in the San Juan Mountains. <br />The Board passed a resolution <br />supporting further work on <br />c10udseeding demonstration projects <br />in the Colorado River Basin. <br />The Colorado River Basin Pilot <br />Project was evaluated by an <br />independent consultant, Aerometric <br />Research Incorporated of Goleta, <br />California, in a report entitled <br />"Comprehensive Evaluation <br />Report-Colorado River Basin Pilot <br />Project". The report concluded that <br />the project demonstrated the reality of <br />the physical concepts of weather <br />modification potential over mountain <br />watersheds, but the test of pilot <br />project seeding methods did not <br />prove successful because of the <br />special constraints imposed by the test <br />procedures. <br /> <br />Lower Colorado River <br />Management Program <br /> <br />The Federal-State Lower Colorado <br />River Management Program Work <br />Group met three times during 1976 to <br />continue coordination of problems of <br />river control, channelization, and <br />environmental preservation and <br />enhancement. The Coordinating <br />Committee did not meet in 1976. The <br />work of both of these groups has <br />been described in previous annual <br />reports. <br />The Bureau of Reclamation <br />continued work to develop a <br />management plan for the lower <br />portion of the Parker Division that <br />included channelization, bank <br />stabilization, and fish and wildlife <br />features. This work had been resumed <br />in July 1975 after almost two years of <br />no action and included a work plan <br />by a subcommittee consisting of <br />representatives from the Bureau of <br />Reclamation, the Colorado River <br />I ndian Reservation, and state and <br />federal fish and wildlife agencies. The <br />subcommitiee presented to the Work <br />Group in March of 1976 a new river <br /> <br />'t <br /> <br />stabilization plan which had been <br />coordinated with the various interests <br />but which still contained some <br />unresolved issues. The major <br />unresolved issues were two dry cuts <br />proposed to eliminate sharp bends in <br />the river, one at Alligator Slough and <br />the other at Hall Island. The Bureau <br />of Reclamation is attempting to <br />develop another channel stabilization <br />plan that would eliminate the dry cuts <br />and still stabilize the existing channel. <br />No further meetings of the Work <br />Group were held during 1976 in <br />regard to this plan. <br />Other activities of the Work Group <br />during 1976 included reviews of <br />proposed plans for dredging an <br />existing lagoon as a park for the City <br />of Needles, improvement of a boat <br />mooring and beach area near the <br />existing Park Moabi Marina, and plans <br />for stabilization with rip rap of about <br />7,000 feet of the west bank of the <br />Colorado River above and below Palo <br />Verde Dam. <br /> <br />Legal Issues <br /> <br />Arizona v. California and Other <br />Lower Basin Water Rights Issues <br /> <br />The Board staff, Attorney General's <br />office, and the various parties to the <br />Arizona v. California litigation <br />continued efforts to settle the issues of <br />present perfected rights. As defined in <br />the 1964 U.s. Supreme Court Decree, <br />present perfected rights are <br />mainstream water rights acquired <br />under state law, or federal reserved <br />water rights, both established prior to <br />June 25, 1929, the effective date of <br />the Boulder Canyon Project Act. <br />In June 1976, the Solicitor of the <br />Department of the Interior invited <br />representatives of the parties to a <br />meeting in Phoenix, Arizona, and <br />presented several changes to the <br />proposed stipulated judgment for <br />present perfected rights. The parties <br />generally accepted these proposed <br />changes and incorporated them into a <br />draft stipulation which was submitted <br />to the Solicitor in July. The Solicitor <br />then made a request for further <br />
The URL can be used to link to this page
Your browser does not support the video tag.