My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11923
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11923
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:18 PM
Creation date
10/12/2006 5:17:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agency Reports - BOR
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1968
Title
Reconnaissance Report - Augmentation of the Colorado River by Desalting of Sea Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,... <br />00 <br />c.o <br />-.J <br /> <br />Federal Investment Cost <br />(Million $) <br /> <br />Fe~!.~E!: <br /> <br />Cons t ruc- <br />tion Cost <br /> <br />Nuclear desalting facilities <br />(including project pumping <br />power) <br />Convey~nce system <br />Total <br /> <br />921 <br />l.,.~~~ <br />2,784 <br /> <br />Interest <br />During Con- <br />struction <br />-------- <br /> <br />Total <br /> <br />53 <br />200 <br />253 <br /> <br />974 <br />l,06~ <br />3,037 <br /> <br />Total annual operating costs include operation, maintenance, <br /> <br />interim replacements, nuclear fuel, and a sinking fund component <br /> <br />to permit rebuilding the nuclear desalting and project pumping <br /> <br />facilities every 30 years through the lOa-year period of analysis. <br /> <br />These costs are sum~arized as follows: <br /> <br />Federal Annual OM&R Costs <br />(Million $) <br /> <br />Feature <br /> <br />QU!i;!3. <br /> <br />Nuclear desalting facilities <br />(including project pumping <br />power) <br />Conveyance system <br />Total <br /> <br />23.99 <br />5.32 <br />29.31 <br /> <br />Sinking Fund <br />For Plant <br />)3.'!.!l laS'!.me~!._ <br /> <br />Total <br /> <br />19.60 <br /> <br />43.59 <br />5.32 <br />48.91 <br /> <br />19.60 <br /> <br />Annual equivalent costs were determined over a 100-year period <br /> <br />of analysis beginning with the completion of the first stage in <br /> <br />1990, using a 3-1/4 percent interest rate. Investment costs and <br /> <br /> <br />operating costs associated with staged development were appropriately <br /> <br />discounted. Total annual economic equivalent costs of investment <br /> <br />averages $91. 7 million; annual OM&R discounted for time of occurrence <br /> <br />averages $39.4 million, making the total annual economic costs <br /> <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.