<br /> <br />The estimated annual operation, maintenance, and replacement <br /> <br />costs after the completJ.on of the three stages of construction <br /> <br />are as fo llows: <br /> <br />Conveyance System <br />Annual OM&R Costs <br />(MJ.lliol1 $) <br /> <br /> Stage <br />:[i'eature 1990 2000 2010 <br />Aqueduct facJ.litJ.es 3,02 3,46 4.11 <br />Transmissi.on system 0.73 1.17 1.21 <br />Total 3,75 4.63 5.32 <br /> <br />Summary of Federal Proiect Costs--A su~nary of the total <br /> <br />Federal project costs for augmentatJ.on of the Colorado River by <br /> <br />2.0 m.a,f. delJ.vered to Lake Mead follows: <br /> <br />26 <br />