My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11923
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11923
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:18 PM
Creation date
10/12/2006 5:17:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agency Reports - BOR
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1968
Title
Reconnaissance Report - Augmentation of the Colorado River by Desalting of Sea Water
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />.... <br />00' <br />c.c <br />o <br /> <br />Dual-Purpose Nuclear'Desalting Plant <br />Construction Costs <br />(Million' $) <br /> <br /> Stage <br />Feature 1990 2000 2010 Tota 1 <br />Nuclear reactor 241 121 121 483 <br />Powerplant 142 71 71 284 <br />Desalting plant 312 179 179 670 <br />Total 695 371 371 1,437 <br />Less non-Federal power costs 258 129 129 -ill. <br />Federal costs 437 242 242 921 <br />Desalted water (381) (214 ) (214 ) (809 ) <br />Nuclear pumping power (56) (28) (28) (112 ) <br /> <br />The annual operation, maintenance, and interim replacement <br /> <br />costs for the dual-purpose plant at the completion of each stage <br /> <br />of installation are as follows: <br /> <br />Dual-Purpose Nuclear Desaltiu, <br />Annual OM&R Costs 1 <br />(Million $) <br /> <br />Plant <br /> <br />Feat~ <br /> <br />Stage (Cumulative) <br />2000 2010 <br /> <br />1990 <br /> <br />Nuclear reactor <br />Thermal powerplant <br />Water plant <br />Total (OM& "Interim R") <br /> <br />, <br />4.24 <br />1.83 <br />9.21 <br />15,28 <br /> <br />8.50 <br />3,65 <br />.!i,]2. <br />31.94 <br /> <br />6.37 <br />2.74 <br />14.50 <br />23.61 <br /> <br />Non-Federal power costs <br /> <br />3.97 <br /> <br />5.96 <br /> <br />7.95 <br /> <br />Federal costs <br />Desalted water <br />Nuclear pumping power <br />Subtotal <br />Sinking fund for rebuilding plants <br />Total <br /> <br />10.45 <br />0.86 <br />11.31 <br />9.32 <br />20.63 <br /> <br />16,36 <br />1.29 <br />17,65 <br />14,46 <br />32.11 <br /> <br />22.27 <br />1.72 <br />23.99 <br />19.60 <br />43,59 <br /> <br />1/ Includes fuel, interim replacements, and for Federal costs <br />an amount for rebuilding the plant at the end of the 30-year <br />service life. <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.