Laserfiche WebLink
<br />I <br />i <br /> <br />i <br /> <br />i <br /> <br />i <br /> <br />I <br /> <br />I <br /> <br />":::t' <br />In <br />r-- <br />C\l <br />o <br />o <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br />V. CLOSED BASIN PROJECT . . . . . . <br />V.l HISTORY OF PROJECT DEVELOPMENT <br />V.2 PROJECT PURPOSES AND OBJECTIVES <br />V.3 PROJECT FEATURES AND OPERATION <br />V.4 STATUS OF CLOSED BASIN PROJECT <br />V.5 CLOSED BASIN PROJECT/CONEJOS BASIN EXCHANGE INVE~TIGATION <br /> <br />VI. RIVER BASIN MODELING. . . . . . . . . . . . . <br />VI.l SELECTION OF A HISTORIC MODELING PERIOD <br />VI.2 TWO MAINSTEM DIVERSION SCENARIOS <br />VI.2.1 Step One Mainstem Diversion Scenario <br />VI.2.2 Alternate Step Two Mainstem Diversion Scenario <br /> <br />VI. 3 RIBSIM MODEL CONFIGURATION <br /> VI. 3 . 1 Flow Base Ge.neration <br /> VI. 3.2 Simplification of Modeled Water Rights <br /> VI. 3.3 Rio Grande Compact <br /> VI. 3 . 4 Closed Basin Project <br /> VI. 3 . 5 Summary of Water Use Network <br /> <br />VI.4 CALIBRATION OF MODEL ...... <br />VI.4.1 Ditch Diversion Comparison <br />VI.4.2 Alamosa Return Flow Analysis <br /> <br />VII. MODEL OPERATION AND INTERPRETATION <br />VII.l 'WATER SUPPLY AND USE SCENARIOS <br />VII.2 TYPES OF STORABLE FLOWS <br /> <br />VII.2.1 Storable Closed Basin Exchange Water <br /> <br /> <br />VII.2.2 Storable Flood Flow Determination <br /> <br /> <br />VII.2.3 Storable Debit Water Determination <br /> <br /> <br />VII.2.4 Storable Seasonal Flow Determination <br /> <br />xii <br /> <br />Page <br />35 <br />35 <br />36 <br />36 <br />39 <br />39 <br /> <br />41 <br />41 <br />44 <br />44 <br />44 <br />46 <br />48 <br />49 <br />51 <br />56 <br />59 <br />64 <br />65 <br />66 <br /> <br />70 <br />70 <br />71 <br />71 <br />71 <br />72 <br />72 <br />