My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11881
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:11 PM
Creation date
10/12/2006 5:15:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1966
Author
US DoI BoR
Title
Narrow Unit Colorado South Platte Division Missouri River Basin Project Appendix I - Designs and Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />\ <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />* <br /> <br />:", r\;: -:: <br />l......:. 'oJ l. <br /> <br />SUMMARY SHE:ETS <br /> <br />Narrows Unit, South Platte Division, Colorado <br />Missouri River Basin Project <br /> <br />January 1961 <br /> <br />LOCATION <br /> <br />Northeastern Colorado along the South Platte River. Irrigable lands <br />are in Morgan, Logan, Washington, and Sedgwick Counties. Narrows <br />Dam and nearly all of the reservoir area are in Morgan County. A small <br />portion of the flood control pool extends into Weld County. <br /> <br />PLAN <br /> <br />New construction for the unit will consist only of the potential Narrows <br />Dam and Reservoir to serve the functions of irrigation, flood control, <br />recreation, fish-wildlife enhancement, and improvement of water quality, <br />Storage water would be released as necessary from the reservoir to <br />supplement irrigation within the service area, totaling 166,370 acres, <br />of the Lower South Platte Water Conservancy District. Supplemental <br />releases will be conveyed downstream in the river channel to the <br />diversion works of existing irrigation systems. No Federal construc- <br />tion of irrigation distribution facilities would be involved. Specific <br />lands and facilities, including the existing Jackson Lake would be <br />required for recreation and fish and wildlife purposes. Minimum down- <br />stream flows for water quality control and fish requirements, would be <br />met by reservoir seepage, stream accretions, and return flows, Future <br />control of Bijou Creek floods could be attained by the construction <br />of diversion facilities and revised reservoir operating criteria. <br /> <br />COSTS <br /> <br />Feature <br /> <br />Costs <br /> <br />$51,000,000 <br />19,000 <br />91,000 <br />2,320,000 <br />2,265,000 <br />125,000 <br /> <br />Narrows Dam and Reservoir <br />O&M housing . . . , . . . <br />Permanent operating facilities. <br />Recreation development .... <br />Fish and wildlife development . <br />Jackson Lake rehabilitation (dual recreation and. <br />fish-wildlife) <br /> <br />TOtal construction cost. , . . . , . . . . . . $61,820,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.