My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11881
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:19:11 PM
Creation date
10/12/2006 5:15:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.400
Description
Narrows Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1966
Author
US DoI BoR
Title
Narrow Unit Colorado South Platte Division Missouri River Basin Project Appendix I - Designs and Estimates
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />rn[~[~ <br />L0UJ <br /> <br />DES I G N SAN DES TIM ATE S <br /> <br />INTRODUCTION <br /> <br />This appendix presents the preliminary designs and feasibility <br />cost estimates for the facilities required to accomplish the objectives <br />of the plan of development for the Narrows Unit. The plan of develop- <br />ment consists of Narrows Dam and Reservoir with appurtenant dikes and <br />the associated relocations of the Union Pacific Railroad, highways, <br />transmission and telephone lines, and oil and gas lines. Recreation <br />and fish and wildlife developments associated with the Narrows Unit <br />are also included. Other features were studied as potential addi- <br />tions to the Unit and are presented in the last section of the <br />appendix. These are the Bijou Creek Diversion Channel; the River- <br />side, Bijou and Sterling Pumping Plants; and the Ovid Well Field, <br /> <br />The designs and estimates for Narrows Dam and the Bijou Creek <br />Diversion Channel were prepared in the Office of Chief Engineer. All <br />other designs and estimates, with the exception of those for recrea- <br />tion and fish and wildlife facilities, were prepared in the Regional <br />Office and reviewed in the Office of Chief Engineer. The designs <br />and estimates are adequate to support the request for authorization <br />of the Narrows Unit. <br /> <br />The Bijou Creek Diversion Channel, the Sterling Pumping Plant, <br />or the Ovid Well Field could be added to the Narrows Unit at any <br />time without change in the design of Narrows Dam or Reservoir. <br />Addition of the Bijou Pumping Plant would require redesign of the <br />Fort Morgan Canal Outlet Works to include additional capacity or <br />addition of a separate outlet works. Addition of the Riverside <br />Pumping Plant would require modification of the design of the out- <br />let end of the River Outlet Works. <br />
The URL can be used to link to this page
Your browser does not support the video tag.