Laserfiche WebLink
<br /> <br /> <br />~ <br />Rugged terrain lorrT1s baCkdrop overlooking Davis Dam. <br /> <br />Outflow Rel,.,1l In 1000 Cl,lblc Feet/Second <br />Actual Operation 1981 <br /> <br /> <br />15, <br />10 <br />5 <br /> <br />Projected Operation 1982 <br />Upper Quartile <br /> <br /> <br />Average, Lower Quartile, <br />Most Adverse <br /> <br /> <br />o N 0 J F M A M J J A S <br /> <br /> <br /> <br />Trestle crane, left, in operation al Havasu Plan! <br /> <br />Storage <br />ACTive Con rent In Million Acre-F.., <br /> <br />25 <br /> <br />20 <br /> <br />15 <br /> <br />10 <br /> <br />5 <br /> <br />ONDJFMAMJJAS <br />Actual 1981 <br /> <br />Lagend <br />Most Probable Du - <br />Upper Quartile <br /> <br /> <br />Twenly-.one millionth visllor aT Hoover Dam. <br /> <br />Elevation In FSllt (Non.Llnear Seele) <br /> <br />1229 <br /> <br />1179 <br /> <br />1136 <br /> <br />1083 <br /> <br />1012 <br /> <br />895 <br /> <br />17 <br />