Laserfiche WebLink
<br />, <br /> <br />, <br /> <br />lh <br />w <br />o <br />N <br /> <br />},~~ <br /> <br /><~ <br />"'if:> <br /> <br />Cavalry battle took place Juring the settleiflciit of the r"Jc;st~ An <br /> <br />existing monument depicting the site is loca.t"ed :lbove CLIC hL:~h F;.:~r' <br /> <br />line of the potential reservoir. This sit"e could be developed D..:. (Jrl.;-', <br /> <br />l"ith the project and provide the opportlJnity and induce;nent for ;wny <br /> <br />to visit the historic and aesthetic ;ire". <br /> <br />Impervious borrow materials would be obtained withi.n tile <br /> <br />dam and reservoir basin and pervious and aggregate materials woulc <br /> <br />be obtained from the t.Jhite River, 22 milPH a'i.,iay. An alterrliJ.te sc~:r(: <br /> <br />for the latter materials would be the Yampa River 32 miles allay. <br /> <br />As with the other potential reservoirs] the borroT,.Y are.-.:.:; in th2 <br /> <br />reservoir basin would be smoothed before storing l"ater :m'" !~he hI);:';:'" <br /> <br />area outside the reservoir basin would be reshaped and revegetated <br /> <br />following excavation. <br /> <br />I_~ ~>. <br /> <br />The riprap source has not been selected but would CO''-"", <br /> <br />either from a Dakota sandstone forrnntion 15 mIles from the damsite <br /> <br />or from the basaltic cap east of the site. The source will be se1- <br /> <br />ected during advQnce planning investigations following an analysis <br /> <br />of environmental and economic effects. <br /> <br />Construction contracts will include provisions for pcoteet- <br /> <br />ing the environment as outlined for Ripple Dam. <br /> <br />Axi.al. Reservoir <br /> <br />The small existing Axial Reservoir adjacent to State Ii ti;hHilY ] ~ <br /> <br />would be t\equired by agreement and administered as a stabl," fish;.i1g <br />