Laserfiche WebLink
<br />" <br /> <br />'~.' <br /> <br />'. <br /> <br />Historical Water Elows and Water Storage in tbe San Juan Basin <br /> <br />River <br />Animas River <br />Animas River <br />Animas River <br />Animas River <br /> <br />~ <br />8/11/97 <br />8/11/96 <br />1995 <br />1996 <br /> <br />2300 efs ' <br />175 efs <br />413,250 aere feet <br />191,642 aeret feet <br /> <br />Total Annual flow <br />Total Annual flow <br /> <br />Animas River 5/17/96 3680 efs <br />Animas River same date 5140 efs <br />Animas River 6/2/97 7220 efs <br />Animas River same date 1090 efs <br />Animas River 8/1 7/96 139 efs <br />Animas River same date 990 efs <br />Animas River 9/7/97 507 efs <br />Animas River same date 1 71 efs <br /> <br />Maximum flow in 1996 <br />Same date in 1997 <br /> <br />Maximum flow in 1997 <br />Same date in 1996 <br /> <br />Minumum flow in 1996 <br />Same date in 1997 <br /> <br />Mimunum flow in 1997 <br />Same date in 1996 <br /> <br />Cost of the Animas-La Plata Project <br /> <br />1990 <br />1997(less 1560 acres) <br /> <br />$582,165,000 <br />$774,000,000 this is 28% increase <br /> <br />If the projeet was in operation water would have been returned to the Animas River 42 days in August and <br />September of 1996, <br /> <br />> <br />t <br />