My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11816
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:58 PM
Creation date
10/12/2006 5:11:42 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
1/1/1997
Title
Historical Water Flows and Water Storage in the San Jaun Basin and Reservoir Statistics
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />'~.' <br /> <br />'. <br /> <br />Historical Water Elows and Water Storage in tbe San Juan Basin <br /> <br />River <br />Animas River <br />Animas River <br />Animas River <br />Animas River <br /> <br />~ <br />8/11/97 <br />8/11/96 <br />1995 <br />1996 <br /> <br />2300 efs ' <br />175 efs <br />413,250 aere feet <br />191,642 aeret feet <br /> <br />Total Annual flow <br />Total Annual flow <br /> <br />Animas River 5/17/96 3680 efs <br />Animas River same date 5140 efs <br />Animas River 6/2/97 7220 efs <br />Animas River same date 1090 efs <br />Animas River 8/1 7/96 139 efs <br />Animas River same date 990 efs <br />Animas River 9/7/97 507 efs <br />Animas River same date 1 71 efs <br /> <br />Maximum flow in 1996 <br />Same date in 1997 <br /> <br />Maximum flow in 1997 <br />Same date in 1996 <br /> <br />Minumum flow in 1996 <br />Same date in 1997 <br /> <br />Mimunum flow in 1997 <br />Same date in 1996 <br /> <br />Cost of the Animas-La Plata Project <br /> <br />1990 <br />1997(less 1560 acres) <br /> <br />$582,165,000 <br />$774,000,000 this is 28% increase <br /> <br />If the projeet was in operation water would have been returned to the Animas River 42 days in August and <br />September of 1996, <br /> <br />> <br />t <br />
The URL can be used to link to this page
Your browser does not support the video tag.