Laserfiche WebLink
<br />to <br />c;.. <br />o <br />M <br />C.J <br />o <br /> <br />CONSTRUCTION IS INITIATED <br />ON STUBB DITCH <br /> <br />is returned to the Salinity Coordination <br />Office, your lateral will be placed <br />on the construction schedule for <br />improvements, <br /> <br />In late January 1991, MCID crews <br />began laying pipe in the Stubb Ditch <br />on the Curtis Talley place northeast <br />of Palisade. Since then, more than a <br />mile of the 42-inch reinforced concrete <br />pressure pipe has been insfalled, <br />Pipe installation includes removing <br />topsoil, excavating trenches, placing <br />and compacting backfill, installing <br />warning tape and tracer wire (used <br />to alert anyone digging), and then <br />replacing the topsoil. <br /> <br />Petition forms to have your lateral <br />improved are available at the Salinity <br />Business Office, 3254 F Road in Clifton, <br />The office is open 8 a.m. to 12 noon <br />and 1 p.m, to 5 p.m. Monday through <br />Friday, <br /> <br />CONSTRUCTION <br />SCHEDULE <br /> <br />After water was turned into the Stubb <br />Ditch, the crews moved to an isolated <br />area west of the 1-70 Business Loop <br />and installed three separate reaches of <br />27 -inch PVC pipe where irrigation water <br />delivery was not impacted, <br /> <br />Both irrigation districts are constructing <br />laterals as funds permit. (The Districts <br /> <br />are anticipating approximately three <br />times the amount of funding as they <br />, mC8iv8d this last year.) Laterals <br />LOW. [I,3r. d' h f II <br />CO W,3t~r Cor.s~rv,3tior. Bo,!nstructe In tea <br />The Price and Stubb Ditch laterals are131J Sh~rm:ar. Street Rm. a-ied forward to the <br />also being piped or concrete lined, The D~r.ver. Co 80203 Istruction schedule <br /> <br />lateral pipe sizes range from 4 to 18 Improved, <br />inches depending on the amount of land <br />being served, the delivery requirements <br />of the lateral, and the grade or degree <br />of fall from the canal to the land being <br /> <br />served, <br /> <br />Construction on the Price Ditch IS <br />tentatively scheduled to begin in <br />November 1992, However, if additional <br />funds are available, construction may <br />start as early as January 1992, <br /> <br />SIGN-UP FOR LATERAL <br />IMPROVEMENT <br /> <br />The majority of lateral construction IS <br />done in the "off season" when water is <br />out of the canal. The lateral systems <br />are designed by the Resident Engineer <br />and the Irrigation Districts are respon- <br />sible for obtaining the rights-of-way <br />and providing construction crews, <br />The Irrigation Districts will also be <br />responsible for the operation and <br />maintenance of the system after <br />completion, <br /> <br />All PID and MCID water users are <br />eligible to have their laterals improved, <br />The only requirement is the completion <br />of a petition (available in the Salinity <br />Coordination Office) by all the water <br />users on your lateral. After the petition <br />