Laserfiche WebLink
<br /> " <br /> 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 <br />!-PARADOX VALLEY UNIT DPR-Final EIS I.. Construction <br />- ~ <br />'-/4 <br />00 i <br />N.AS VEGAS WASH UNIT DPR-Final EIS Verification studies <br /> I <br />CRYSTAL GEYSER Unit Deferred Indefinitely - <br /> , <br />GRAND VALLEY UNIT <br />STAGE 1 DPR-Draft EA. Environ.-Neg, Del. Construction Full Operation <br /> , <br />GRAND VALLEY UNIT Advance Planning <br />STAGE 2 EIS-DPR Construction <br /> , <br />LAVERKIN SPRINGS Status Report Unit Deferred Pending Special Studies <br /> Advance <br />LOWER VIRGIN RIVER Feasibility Report-Final EIS Review. Authorization Planning-DPR <br />GLENWOOD-DOTSERO Appraisal <br />UNIT Report Feasibility Report-Final EIS *'* : Review. Authol <br /> i <br />PALO VERDE UNIT Special Report Status Report Verif,ication stud ies <br />COLO RIVER INDIAN UNIT Special Report Status Report Unit Deferred Indefinitely <br /> Authori- <br />UINTA BASIN UNIT Feasibility Report-Final EA Review. zation A, <br />LOWER GUNNISON UNIT Feasibility Report-Final EA Review. Authorization Advance PI <br /> , Autho <br />BIG SANDY UNIT Feasibility Report-Final EIS .. Review. zation <br />MCELMO CREEK UNIT Feasibility Report-Final EIS Review. I Authorizatic <br />MEEKER DOME UNIT Problem 10 & Quantification .. Verification studies <br /> , <br />PRICE - <br />SAN RAFAEL RIVER UNIT Feasibility Report-Final EIS .. <br /> , <br /> : .. <br />DIRTY DEVIL RIVER UNIT Feasibility Report-Final EIS , <br />PIPELINE COLLECTOR Appraisal <br />SYSTEM Report Feasibility studies <br />ENV,STATEMENTS Final EIS-CRWQIP Basinwide Statement Deferred I <br />WATER QUALITY Status Draft Plan <br />SALINITY STANDARDS Report of Study Update Model Studies Update Update <br /> <br />. Review by Dept. of Interior, WRC, OMB, and EPA (for EIS), , <br />.. Award of professional services contract <br /> <br />COLORADO RIVER WATER QUALITY IMPROVEMENT PROGRAM SCHEDULE <br /> <br />-. <br />