My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11802
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11802
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:55 PM
Creation date
10/12/2006 5:11:24 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
12/1/1980
Author
DOI BOR
Title
Salinity Update - December 1980 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />denSity The Canal prism then can be re- <br />e)(ca~ated uSing scrapers and a trim- <br />ming machine which IS a modified <br />trenching maCnlne <br /> <br />After the canal prism IS e)(ca~ated to <br />approximate finiSh grade me slip form <br />pa~ing machme (built espectally for thIs <br />prOject I IS pulled ttHOugh the canal by a <br />Oozer The maChine is designed to place <br />concrete on the entire prism III one pass <br /> <br />..... <br />C'J <br />r:....'"'l <br />o <br /> <br />~~ <br /> <br />.A <br /> <br />,'r <br /> <br />t _-~ <br /> <br />~ <br /> <br />r. >:I <br />~ <br /> <br />, <br /> <br />The macnlne Will be gUided by a skid <br />plate approximately 8 feet long WhiCh <br />fils the trimmed pflsm. Behind the sk.ld <br />plate IS another plate offset 2"2 mChes <br />lhe design thICl<.ne-ss 01 the concrete <br />Immg The concrete Will be place-d Into <br />tf'le canal bet....een the earth and the <br />offset plate As the- slip lorm paving <br />maChtne!s PU))l<d ttHOughlhe canal the <br />concrete- lining IS smoothed and the- <br />POly....lnyl Chloride strips placed In the <br />longltudmal Jomts In the Immg <br /> <br />,-- <br /> <br />i:;! <br />III <br />L"1 <br /> <br />~ <br />III <br /> <br />Construction 01 Slage One will allow <br />In~estlgalors to ....erlly effects 01 Initial <br />de~elopment w~le p1anfllng contmues <br />on the rest oltne unit If the salinity <br />re-auctlon ef1ects are as predicted, <br />construCltOn of Stage Two could begin <br />as early as fiscal year 1985. and salinlly <br />reduction Will be yel another slepc!oser <br /> <br /> <br /> <br /> <br />~~ <br /> <br />.,..'~~~ <br /> <br />~~ <br />~,. .":,,,- <br />~ ~- ... <br />. - -- .. ~ .. <br />"'>~~';;, - <br />1o.riI~";a <br />-".".~ ....~ <br /> <br />- <br /> <br />----- <br /> <br />, <br />
The URL can be used to link to this page
Your browser does not support the video tag.